沈卢高速沈丘至遂平段
Search documents
通途贯东西 发展“跑”起来——沈卢高速为中原发展注入新动能
He Nan Ri Bao· 2025-12-05 23:34
Core Insights - The Shenlu Expressway segment from Shenqiu to Suiping is set to officially open by the end of December, enhancing regional development in Central China [1] - The expressway, spanning 105.96 kilometers with a total investment of 13.629 billion yuan, connects key transportation networks and facilitates faster logistics and passenger flow [1] Group 1: Project Overview - The Shenlu Expressway segment is a crucial link between Zhoukou and Zhumadian, featuring a dual four-lane design with 46.12 kilometers in Zhoukou and 59.84 kilometers in Zhumadian [1] - The project connects to the Shanggu Expressway and the Beijing-Hong Kong-Macau Expressway, forming a significant transportation network that integrates the Yangtze River Delta and the Belt and Road Initiative [1] Group 2: Quality and Safety Measures - The project team emphasizes quality as the lifeline of the engineering, implementing a "11356" management system to achieve long-term quality goals [2] - Special measures for winter construction include using insulation techniques for concrete pouring and strict control of moisture content in roadbed filling to ensure stability [2] - The project has achieved zero accidents since its inception and has been recognized as a provincial-level "Safety Production Demonstration Unit" [2] Group 3: Innovation and Efficiency - The project promotes collaboration between academia and industry, working with institutions like Zhengzhou University to enhance construction techniques and materials [2] - A total of 198 innovative results have been generated through ongoing improvement activities, with 68 outstanding results being implemented across the project [2] - The project has also secured 12 provincial-level construction methods and 26 authorized patents, showcasing its commitment to innovation [2] Group 4: Environmental Considerations - The project adopts a sustainable approach to land use, implementing a "river dredging + reservoir silt removal + land transformation" model to protect basic farmland [3] - Through these efforts, 730 acres of land have been created while saving 20,000 acres of farmland, achieving a "zero take, zero occupy" policy for basic farmland [3] - The project has successfully integrated ecological considerations, ensuring clean waterways and connected farmland alongside the expressway [3]