环控系统合同能源管理项目
Search documents
地铁设计(003013.SZ)与广州地铁集团签订合计9.24亿元相关合同
智通财经网· 2026-02-09 08:44
Core Viewpoint - The company has signed contracts with Guangzhou Metro Group for energy management projects related to the control systems of metro lines, with a total contract value of 924 million yuan [1] Group 1: Contract Details - The contracts involve the energy management projects for the control systems of Line 1, the original Line 2, and Line 4 of the metro [1] - The duration of the contracts spans from 2025 to 2043 [1] - The total contract price is set at 924 million yuan [1]
地铁设计(003013.SZ):签署合计9.24亿元合同
Ge Long Hui A P P· 2026-02-09 08:30
Core Viewpoint - The company, Metro Design (003013.SZ), has signed contracts with Guangzhou Metro Group for energy management projects related to the control systems of several metro lines, totaling 924 million yuan [1]. Group 1 - The company received contracts for the energy management projects for Line 1, the original Line 2, and the first section of Line 4 [1]. - The total value of the contracts is 924 million yuan, covering the period from 2025 to 2043 [1]. - The contracts are divided into two parts: Contract One for Operation Center One and Contract Two for Operation Center Two [1].
地铁设计:签署合计9.24亿元合同
Ge Long Hui· 2026-02-09 08:24
Core Viewpoint - The company, Metro Design (003013.SZ), has signed contracts with Guangzhou Metro Group and its wholly-owned subsidiary, Kehui Company, for energy management projects related to the control systems of several metro lines, totaling 924 million yuan [1]. Group 1 - The contracts include two projects: "Contract One" for the energy management of the control systems for Line 1, the original Line 2, and the first section of Line 4, and "Contract Two" for the same systems at a second operational center [1]. - The duration of these contracts spans from 2025 to 2043, indicating a long-term commitment to the energy management of the metro systems [1].