磷酸铁锂储能系统集成设备(含EMS)

Search documents
EPC限价0.88元/Wh、系统限价0.56元/Wh!
鑫椤储能· 2025-10-13 08:07
Core Viewpoint - The article discusses the public tender announcement for the first phase of the 201MW/401MWh independent energy storage project in Weifang, Shandong, highlighting the project's scale, budget, and technical specifications [1][2]. Group 1: Project Overview - The energy storage station is divided into two phases, with the first phase having a capacity of 100MW and 200MWh [3][4]. - A new 220kV booster station will be constructed as part of the first phase, which includes plans for two additional transformers in the future [3][4]. - The project site is located in the southwest corner of the Advanced Manufacturing Industrial Park in Weifang, Shandong, with favorable environmental and transportation conditions [3]. Group 2: Tender Details - The maximum bid control price for the project is set at 176 million yuan, equivalent to 0.88 yuan/Wh, with specific control prices for components such as the lithium iron phosphate energy storage system [10]. - The tender includes comprehensive responsibilities such as surveying, design, equipment procurement, construction, acceptance testing, and system commissioning [5][6][7]. Group 3: Timeline and Milestones - The project is scheduled to commence construction by the end of October 2025, with a planned grid connection by March 25, 2026, and completion of network testing by May 31, 2026 [9]. Group 4: Bidder Qualifications - Bidders must meet specific qualifications, including having independent contract capabilities, good credit status, and relevant project experience in energy storage or renewable energy projects [11][13]. - The project requires bidders to have a minimum of 100MW capacity project experience and specific certifications related to electrical engineering and safety [13].