1705MW/6430MWh储能系统设备招标
中关村储能产业技术联盟· 2025-07-25 09:43
Group 1 - The article discusses multiple independent energy storage projects in Inner Mongolia, including the procurement of energy storage system equipment for three distinct projects with varying capacities [1][2] - The projects include a 500,000 kW/2,000,000 kWh independent energy storage project in Huade, a 400,000 kW/1,600,000 kWh project in Dengkou County, and a 400,000 kW/1,600,000 kWh project in Balinzuoqi, Chifeng City [1][2] - Bidders can participate in multiple segments but can only win one segment, with a specific order of candidate recommendation for each segment [1] Group 2 - Shandong High-Speed Energy Development Co., Ltd. plans to procure lithium iron phosphate energy storage system equipment with a total capacity of 195 MW/390 MWh to meet project demands [4] - The procurement includes production, supply, transportation, warranty, and after-sales service for the energy storage system equipment [4] Group 3 - China Railway Ninth Bureau Group is conducting a secondary public tender for a 210 MW/840 MWh independent energy storage power station project, which will utilize lithium iron phosphate batteries [5][6] - The project will consist of 42 basic storage units, each configured with two 40-foot 10 MWh battery cabins and one transformer unit [5]
200MW/800MWh!中节能内蒙古乌兰察布独立储能设备采购
中关村储能产业技术联盟· 2025-06-18 03:59
Core Viewpoint - The article discusses the procurement announcement for the 200MW/800MWh independent energy storage project located in Tianpishan Industrial Park, Inner Mongolia, which is planned to be completed and operational by 2025 [1][3]. Project Overview - The project involves the construction of a non-walk-in liquid-cooled lithium iron phosphate energy storage system with a capacity of 200MW and an energy storage capacity of 800MWh [3][4]. - The project site is situated in a flat alluvial plain with convenient external transportation access, including proximity to major highways [3]. Procurement Details - The procurement is organized by China Energy Conservation and Environmental Protection Group Co., Ltd. and invites qualified bidders to participate [2][3]. - The procurement method is open bidding, and the deadline for bid submission is set for July 7, 2025 [17]. Technical Specifications - The energy storage system must include a battery capacity of no less than 800MWh and must be equipped with a five-year warranty [4]. - The project requires bidders to have capabilities in the independent research and production of at least three types of products related to energy storage systems [12]. Bidder Qualifications - Bidders must be legally registered entities in China with independent legal status and must not be under any bankruptcy or administrative penalties [6][7]. - Financial requirements include providing audited financial reports for the past three years and demonstrating relevant project experience in energy storage [9][10]. Submission and Opening Procedures - Bidders must register on the electronic procurement platform to obtain bidding documents and submit their bids online [16][19]. - The opening of bids will occur online, and bidders must use a digital certificate for participation [17][18].
山东高速鲁东新能源200MW/400MWh共享储能电站项目招标
中关村储能产业技术联盟· 2025-06-15 12:22
Core Viewpoint - The announcement of the construction general contracting tender for the shared energy storage power station project by Shandong High-speed Ludong New Energy Co., Ltd. indicates a significant investment in energy storage capacity, with a scale of 200MW/400MWh, reflecting the growing trend in renewable energy and energy storage solutions in China [1][4]. Group 1: Project Overview - The shared energy storage power station project is located in Weihai, Shandong Province, covering an area of approximately 50 acres, and will be connected to the grid via a 220KV line [4]. - The project will utilize 195MW lithium iron phosphate batteries and 5MW sodium iron phosphate batteries, highlighting the focus on advanced battery technologies [4]. - The construction contract includes all procedures related to engineering construction and grid connection debugging, as well as civil compensation and coordination during the construction period [4][5]. Group 2: Tender Conditions - The tender is organized as a public bidding process, with a planned construction period of 6 months and 100% funding sourced from the company itself [3]. - Bidders must possess independent legal status, hold valid business licenses, and have qualifications for power engineering construction [6]. - Bidders are required to have experience in at least one energy storage project with a scale of 100MWh or more in the past three years [6]. Group 3: Bid Submission and Opening - The deadline for bid submission is set for July 4, 2025, at 09:00, and bids must be submitted through the Shandong High-speed bidding procurement platform [8]. - The opening of bids will also take place on the same day and at the same platform, ensuring transparency in the bidding process [8]. Group 4: Market Context - The energy storage market in Shandong is experiencing rapid growth, with a reported 228% year-on-year increase in newly installed energy storage capacity [12]. - The province aims to exceed 10GW of new energy storage capacity by the end of the year, indicating strong governmental support and market potential for energy storage projects [12].