西部管道公司精河县34万千瓦光伏项目
Search documents
340MW!国家管网首个大型地面集中式光伏项目并网
Xin Hua Wang· 2025-10-20 05:47
Core Viewpoint - The first ground-based centralized large-scale photovoltaic power generation project by the National Pipeline Network Group has achieved grid-connected trial operation, significantly promoting the green and low-carbon development of China's oil and gas industry [1][2] Group 1: Project Overview - The project, located in Jinghe County, Xinjiang, has a capacity of 340,000 kilowatts and occupies approximately 10,636 acres [1] - The designed annual average power generation is 623 million kilowatt-hours, with an average utilization hours of 1,409.70 hours per year [1] - Under a 5% power limitation rate, the average annual grid-connected electricity is approximately 592 million kilowatt-hours [1] Group 2: Environmental and Economic Impact - The project is expected to save approximately 178,100 tons of standard coal annually and reduce emissions of carbon dioxide by about 488,000 tons, sulfur dioxide by approximately 49.15 tons, and nitrogen oxides by around 78.76 tons [2] - The integration of photovoltaic power generation with livestock farming helps alleviate land use conflicts and promotes ecological restoration and environmental improvement [1][2] - The generated electricity will be fully integrated into the Xinjiang power grid and utilized by self-built projects and upstream and downstream related users through market transactions [2]