轻型双发直升机

Search documents
暴雨警报响起,无人机冲上天空
Liao Ning Ri Bao· 2025-07-15 01:21
Core Insights - The article highlights the advanced emergency response capabilities of the Liaoning Electric Power Company, showcasing the integration of high-tech equipment in their operations [1][2] Group 1: Emergency Response Innovations - The emergency drill demonstrated the use of a vertical take-off fixed-wing drone equipped with infrared cameras, capable of completing in 2.5 hours the work that would traditionally take 3 days [1] - The drill simulated severe weather conditions and high-speed rail disruptions, emphasizing the need for rapid response and precision in fault rectification [1] - A new method of grid inspection was introduced, utilizing a "one machine relay, one machine operation" model to enhance efficiency within a 50-kilometer radius [1] Group 2: Technological Integration - The drill featured a 5G communication network established by drones, showcasing the use of advanced technology for emergency communications [1] - A drainage robot was deployed to remove water from substations at a rate of 1,200 cubic meters per hour, illustrating the application of robotics in utility management [1] - The operation involved real-time data reception from over 160 satellites, providing detailed imagery of infrastructure conditions [1] Group 3: Operational Efficiency - The control system demonstrated by the company allowed for simultaneous operation of four drones for comprehensive inspections, highlighting the operational capabilities in maintaining power supply [2] - The emphasis on minimizing disruption to high-speed rail services during emergency repairs reflects the company's commitment to operational excellence [1]