Workflow
进口发泡芯线挤出机
icon
Search documents
沃尔核材:2025年以来公司的进口发泡芯线挤出机按计划陆续到货
Zheng Quan Ri Bao Wang· 2026-01-12 11:11
Group 1 - The core point of the article is that沃尔核材 (Wolfe Materials) has received 16 imported foam core line extruders since 2025, with additional equipment delayed due to shipping issues [1] - The company is actively following up on the delayed equipment and plans to match market demand once the equipment is delivered and tested [1]
沃尔核材:公司目前已拥有16台进口发泡芯线挤出机,其余设备因客观因素到货时间较原计划有所延后
Mei Ri Jing Ji Xin Wen· 2026-01-08 04:36
Group 1 - The company has received 16 imported foam core extrusion machines since 2025, with the remaining equipment delayed due to shipping times [1] - The company is actively following up on the delayed equipment and plans to match market demand once the machines are delivered and tested [1] - An investor inquired about the company's market performance and production expansion plans, specifically regarding the operation of foam machines during the New Year period [3] Group 2 - The company aims to increase production and sales of high-speed copper cables, indicating a focus on expanding its manufacturing capabilities [3]
沃尔核材:目前公司已拥有15台进口发泡芯线挤出机
Mei Ri Jing Ji Xin Wen· 2026-01-05 11:13
Core Viewpoint - The company has received 15 out of the planned 20 imported foam core line extruders, with delays in the remaining equipment due to shipping factors, and is actively following up on the situation [2] Group 1: Equipment Delivery - The company has successfully received 15 imported foam core line extruders as per the planned schedule [2] - The remaining equipment is delayed due to objective factors such as shipping time [2] Group 2: Production Plans - Once the equipment is delivered and tested, the company will align production with market demand [2]
沃尔核材:今年以来公司的进口发泡芯线挤出机按计划陆续到货,目前公司已拥有15台进口发泡芯线挤出机
Mei Ri Jing Ji Xin Wen· 2025-12-31 01:16
Core Viewpoint - The company has successfully received and is currently operating 15 imported foam core extrusion machines, with additional machines delayed due to shipping factors, and is actively following up on the situation [1] Group 1: Equipment Status - The company initially planned to have over 20 imported foam core extrusion machines by the end of the year, but the arrival of some equipment has been delayed [1] - As of December 31, the company confirmed it has received 15 machines, with the remaining equipment affected by shipping times [1] Group 2: Production and Testing - The company reported that it has mass-produced 6 machines and is testing 3 machines as of October 13, with plans to have 7 machines mass-produced by mid-December [1] - The production process for high-speed communication lines is complex, requiring time for mold development and technical parameter adjustments after the equipment arrives [1]
沃尔核材(002130.SZ):目前公司已拥有15台进口发泡芯线挤出机
Ge Long Hui· 2025-12-31 01:12
Group 1 - The core point of the article is that沃尔核材 (002130.SZ) has received 15 imported foam core line extruders this year, with the remaining equipment delayed due to shipping factors [1] - The company is actively following up on the delayed equipment and plans to complete the installation and debugging process before matching the equipment with market demand [1] - The production process for high-speed communication lines is complex, requiring time for mold development and technical parameter adjustments after the equipment arrives [1]
沃尔核材(002130.SZ):截至目前,公司已实现量产的进口发泡芯线挤出机共7台
Ge Long Hui· 2025-12-03 07:37
Core Viewpoint - The company has achieved mass production of seven imported foam core extrusion machines as of now [1] Group 1 - The company is actively engaging with investors through an interactive platform [1] - The production milestone indicates progress in the company's manufacturing capabilities [1]
沃尔核材(002130.SZ):到今年年底公司将拥有二十余台进口发泡芯线挤出机
Ge Long Hui· 2025-11-12 07:53
Core Insights - The company will have over twenty imported foam core line extruders by the end of this year [1] - The demand for high-speed communication is increasing, leading to an expanding market space [1] - The company plans to match production capacity according to customer needs [1]
沃尔核材:目前正在量产运行的进口发泡芯线挤出机有7台
Mei Ri Jing Ji Xin Wen· 2025-11-03 03:47
Core Viewpoint - The company has reported strong operational data in its Q3 financial results, but its market valuation has not performed well. Group 1: Production and Capacity - The company currently has 7 imported foam core extrusion machines in operation, with additional equipment expected to enhance production capacity significantly after installation and testing [1] Group 2: Business Performance - The revenue from the company's high-speed communication cables has increased rapidly, with a growth of over 300% compared to the same period last year, and its market share is continuously rising [1] Group 3: Market Outlook - The company’s high-speed communication cables possess advantages such as excellent high-frequency performance, bend resistance, low cost, high reliability, and a complete industrial chain, indicating substantial market demand and application potential [1] Group 4: Electronic Materials Sector - The company is a leading player in the heat shrink materials industry, maintaining steady growth in recent years. The expansion of electronic materials in high-end applications and emerging fields like nuclear power, aerospace, new energy vehicles, and low-altitude aircraft will provide broader market opportunities for its electronic materials business [1]
沃尔核材(002130.SZ):已有部分关键设备到货并投产,已经正常生产的进口发泡芯线挤出机5台
Ge Long Hui· 2025-09-12 07:32
Group 1 - The company is steadily advancing its capacity expansion to meet the growing market demand [1] - Several key pieces of equipment have already arrived and are in production, including five imported foam core extrusion machines that are currently operational [1] - By the end of this year, the company will have over twenty imported foam core extrusion machines, significantly enhancing its high-speed line capacity [1] Group 2 - An additional ten imported foam core extrusion machines are expected to arrive by the end of April next year, leading to another leap in high-speed line capacity [1]