300兆瓦级F级燃气轮机转子锻件
Search documents
300兆瓦级燃气轮机转子锻件通过鉴定
Zhong Guo Hua Gong Bao· 2026-02-04 04:24
Core Viewpoint - China First Heavy Industries (中国一重) successfully completed the trial production of a representative sample of the 300 MW F-class gas turbine rotor forgings, meeting the technical requirements for manufacturing capabilities [1] Group 1: Product Development - The product identification meeting for the 300 MW F-class gas turbine rotor forgings was held in Qiqihar [1] - Experts from Tsinghua University, Shanghai Turbine Works, Harbin Turbine Works, Northwestern Polytechnical University, and the Institute of Metal Research, Chinese Academy of Sciences, participated in the evaluation [1] - The evaluation concluded that the trial production results met the technical conditions required for the product [1] Group 2: Manufacturing Capability - China First Heavy Industries demonstrated the capability to manufacture complete sets of 300 MW F-class gas turbine rotor forgings [1] - The successful trial production aligns with the product ordering technical requirements [1]
【行业新闻】中国一重300兆瓦级F级燃气轮机转子锻件通过鉴定
Xin Lang Cai Jing· 2026-02-04 01:13
Core Insights - China Yichong's 300 MW F-class gas turbine rotor forgings have passed certification, meeting technical requirements for product orders [1][2][3] - Heavy-duty gas turbines are considered the "crown jewel" of the equipment manufacturing industry, with self-controllable core technology being a strategic foundation for national energy security and the enhancement of high-end equipment manufacturing levels [3][5] Technical Breakthroughs - China Yichong has achieved significant breakthroughs in key material and thermal processing technologies, including ultra-pure steel ingot smelting, fine crystal control, toughness matching, uniformity in heat treatment, and control of micro-defects [3][5] - The company has established a theoretical system and technical standards for manufacturing large-section turbine discs suitable for heavy-duty gas turbines, which has profound strategic significance for building a new power system, achieving "dual carbon" goals, and ensuring the security of the national energy supply chain [3][5] Project Progress - The development of the 300 MW F-class heavy-duty gas turbine has seen the completion of the first prototype's assembly, ignition, full-load testing, and preliminary reliability verification, with a second prototype set to be assembled soon [3][5]