35吨敞顶箱运输
Search documents
钢铁巨龙驰骋天山南北——铁路运输提质增效助力新疆打造经济增长“新引擎”
Zhong Guo Zheng Quan Bao· 2025-09-19 22:21
Core Insights - The Xinjiang railway network has significantly improved logistics efficiency, facilitating the transportation of coal, minerals, and agricultural products, thus becoming a vital artery for national energy transport [1][12] - The "no-drop" coal transportation process enhances cleanliness and efficiency, with loading times reduced to 30 minutes for a full train [2][3] - The annual freight volume on the Uj railway is projected to increase from 56.48 million tons in 2021 to 108 million tons in 2024, marking a 91.2% increase in transport capacity [3][4] Transportation Efficiency - The Uj railway's daily train departures have increased from over 10 to 92, significantly boosting coal transport capabilities [3] - The "no-drop" coal transportation system allows for a seamless process from mining to delivery, enhancing operational efficiency [2][4] - The total coal transport volume from Xinjiang is expected to reach 90.61 million tons in 2024, more than tripling since 2020 [4] Tourism Development - The introduction of the Z6516 sleeper train has reduced travel time from Urumqi to Kashgar from over 20 hours to 11.5 hours, stimulating local tourism [6][8] - Tourist numbers in Kashgar have surged from 3.6 million in 2012 to 41.98 million in 2024, with tourism revenue increasing from 2 billion to 35.8 billion yuan [7][8] - The railway department has launched over 300 tourist trains in 2023, with a 90.5% increase in inbound tourist trains compared to the previous year [8] Cross-Border Trade - The Alashankou port has facilitated over 5,000 China-Europe freight trains this year, with an average of 20 trains passing daily [9][10] - The implementation of a "smart railway port + local rapid customs clearance" model has significantly improved customs efficiency, reducing processing time to as little as 20 minutes [10][11] - The railway network now connects to 21 countries, expanding the range of goods transported to over 200 categories [11] Infrastructure Development - The Xinjiang railway network covers over 80% of the region's county-level administrative areas, enhancing connectivity [11][12] - The annual passenger volume is projected to rise from 21.62 million in 2012 to 50.8 million in 2024, reflecting improved service capacity [11] - The freight transport volume is expected to reach 237 million tons in 2024, a 36% increase from 2020, driven by strong demand for coal and agricultural products [11]