Workflow
65t级储能正面吊
icon
Search documents
三一海工推出全球“双首台”储能正面吊
Zheng Quan Ri Bao Wang· 2025-08-05 07:45
Core Viewpoint - SANY Group has developed the world's first 65-ton energy storage front crane and a 50-ton pure electric energy storage front crane, enhancing operational efficiency and safety in energy storage applications [1] Product Development - SANY Marine Heavy Industry launched the 65-ton energy storage front crane in March, which has been operational for nearly six months after passing national certification [1] - The 50-ton pure electric energy storage front crane was officially launched at the end of July and is designed to support both charging and discharging modes, complementing fuel-powered versions [1] Technical Specifications - The 65-ton crane has a rated load of 65 tons and a maximum outreach of 7.9 meters, allowing for cross-line lifting within factories, effectively saving operational space and significantly improving work efficiency [1] - The crane features an efficient hydraulic system with a 20% increase in system pressure and a 40% reduction in pressure loss [1] Safety and Comfort Features - The 65-ton energy storage front crane is equipped with a new generation of upgraded cab that enhances visibility, interior comfort, and safety [1] - It includes a human-machine safety warning system with proactive warning and braking functions to ensure safe operations [1]
三一储能正面吊:全球“双首台”,领先不止一步
Core Insights - SANY has established itself as a leader in the energy storage industry by providing customized lifting solutions with high efficiency, low energy consumption, high safety, and comfort [1] Group 1: Product Development - In March, SANY launched the world's first 65-ton energy storage front lift, which has been in stable operation at customer sites for nearly six months after passing national certification [1][3] - In July, SANY introduced the world's first 50-ton pure electric energy storage front lift, designed to support both charging and swapping modes, complementing the fuel version [1] Group 2: Performance and Efficiency - The 65-ton energy storage front lift has a rated load of 65 tons and a maximum outreach of 7.9 meters, significantly improving operational efficiency and reducing the required work area [3] - The hydraulic system of the lift has seen a 20% increase in system pressure and a 40% reduction in pressure loss, leading to a 10% decrease in fuel consumption for the same operational workload [3] Group 3: Safety and Comfort - The 65-ton energy storage front lift features an upgraded driver’s cabin that enhances visibility and comfort, along with a human-machine safety warning system that includes proactive alerts and braking functions [5] - Customer feedback highlights the stability and convenience of the 65-ton lift, noting faster response times, precise operations, and improved safety measures [7]