Workflow
G92杭州湾地区环线高速公路宁波戚家山至舟山金塘段土建施工工程
icon
Search documents
浙江沪杭甬附属订立土建施工合同
Zhi Tong Cai Jing· 2025-09-25 14:37
Core Viewpoint - Zhejiang Huhangyou (00576) announced the signing of construction contracts for the G92 Hangzhou Bay Ring Expressway project, specifically for the Ningbo Qijia Mountain to Zhoushan Jintang section, indicating a significant step in infrastructure development in the region [1] Group 1: Contract Details - The company’s non-wholly owned subsidiary, Zhejiang Yongzhou Double Line Phase II Expressway Co., Ltd., entered into a construction contract with Jiaogong Group for the TJ1 segment of the project [1] - Jiaogong Group will be responsible for various engineering tasks including the implementation and completion of the roadbed works, U-shaped trench sections, and the underwater shield tunnel [1] - A separate contract was signed with Jiaogong Road and Bridge for the TJ4 segment, which includes roadbed, bridge structures, and tunnel sections, along with other related engineering works [1] Group 2: Engineering Responsibilities - Jiaogong Group's responsibilities encompass the left and right line roadbed works, U-shaped trench sections, and underwater shield tunnel construction [1] - Jiaogong Road and Bridge will handle the roadbed, bridge structures using prestressed concrete T-beams, and various tunnel and interchange engineering tasks [1] - Both contractors are also responsible for defect liability during the defect liability period after project completion [1]
浙江沪杭甬(00576)附属订立土建施工合同
智通财经网· 2025-09-25 14:36
Core Viewpoint - Zhejiang Huhangyou (00576) announced the signing of construction contracts for the G92 Hangzhou Bay Ring Expressway project, specifically for the Ningbo Qijia Mountain to Zhoushan Jintang section, indicating ongoing infrastructure development in the region [1] Group 1 - The company’s non-wholly owned subsidiary, Zhejiang Yongzhou Second Line Expressway Co., Ltd., has entered into construction contracts with Jiangong Group for the TJ1 and TJ4 sections of the G92 Hangzhou Bay Ring Expressway [1] - Jiangong Group will be responsible for various engineering tasks including the implementation and completion of the roadbed works, U-shaped trench sections, and the underwater shield tunnel [1] - Jiangong Road and Bridge will handle the roadbed, bridge structures, tunnel sections, interchanges, and other related engineering works for the specified sections of the expressway [1]