Workflow
LNG 发电
icon
Search documents
粤电力A(000539) - 000539粤电力A投资者关系管理信息20251118
2025-11-18 08:00
Group 1: Installed Capacity Overview - The company has a diversified power generation structure, including coal, LNG, and hydropower projects. As of the first three quarters of 2025, the total installed capacity is 40,559.3 MW, with coal power accounting for 20,010 MW (49.34%) [2] - The installed capacity for gas power is 11,847 MW (29.21%), wind power is 3,895 MW (9.60%), solar power is 4,574.5 MW (11.28%), and hydropower is 132.8 MW (0.33%). The total renewable energy capacity is 8,702.3 MW (21.46%) [2] Group 2: New Capacity Additions During the 14th Five-Year Plan - During the 14th Five-Year Plan, the company has added approximately 2,860 MW of coal power, 2,865 MW of gas power, 3,812.7 MW of wind power, 3,286 MW of solar power, and 100 MW of biomass power [2][3] Group 3: Ongoing and Future Projects - Currently, the company has 8,000 MW of coal power under construction, with an expected 3,000-5,000 MW to be operational by the end of 2025, and the remainder in 2026-2027 [3] - There are also 2,942 MW of gas power projects and 1,250 MW of solar and wind projects under construction, with potential adjustments to the operational timeline based on construction progress [3] Group 4: Financial Health and Debt Management - As of Q3 2025, the company's debt-to-asset ratio is 79.45%. The company plans to explore equity financing channels to manage and reduce this ratio [4] - In 2023, the company raised 4.5 billion CNY through equity financing by introducing six strategic investors [4] Group 5: Dividend Policy - The company adheres to a "profit means dividend" policy, aiming to distribute at least 10% of the annual distributable profit as cash dividends. The minimum cash dividend proportion in any profit distribution should be 20% [5] - Over the last three years, the cumulative cash dividends should not be less than 30% of the average annual distributable profit [5]