PCB(单面板

Search documents
澳弘电子: 容诚会计师事务所(特殊普通合伙)关于常州澳弘电子股份有限公司向不特定对象发行可转换公司债券申请文件的审核问询函中有关财务会计问题的专项说明(修订稿)
Zheng Quan Zhi Xing· 2025-08-31 10:20
Core Viewpoint - Changzhou Aohong Electronics Co., Ltd. is issuing convertible bonds to unspecified objects to finance the construction of a production base in Thailand, which is expected to generate significant revenue and has a favorable internal rate of return [1][2]. Financing Scale and Effectiveness Assessment - The total investment for the Thailand production base project is estimated at 595.04 million yuan, with an expected annual revenue of 663.2 million yuan upon reaching full production [1][2]. - The project's internal rate of return before tax is projected at 13.77%, with a payback period of approximately 7.39 years, including a 2-year construction period [1][2]. Project Investment Breakdown - The investment structure includes: - Construction costs: 157.51 million yuan (26.4%) - Site decoration: 19.11 million yuan (3.2%) - Hardware equipment: 384.28 million yuan (64.4%) - Software tools: 2.5 million yuan (0.4%) - Other construction costs: 29.83 million yuan (5.0%) [2][4][7]. Construction and Equipment Details - The total construction area for the project is 70,574 square meters, which includes main and auxiliary factories, employee living quarters, and various utility buildings [1][8]. - The average construction cost is estimated at 0.22 million yuan per square meter, which is consistent with local pricing [1][12]. - The hardware equipment investment is primarily based on historical procurement prices and current market rates, with a total of 384.28 million yuan allocated for various production and testing equipment [4][6]. Production Capacity and Comparison - The project aims to achieve an annual production capacity of 1.2 million square meters of single-sided, double-sided, and multilayer boards [1][8]. - The unit capacity corresponding to the construction area is 588.11 square meters per million square meters, which is comparable to previous projects and within the reasonable range of industry standards [8][9]. Cost Comparison with Industry Peers - The construction cost per square meter for this project is 0.25 million yuan, which is within the range of similar projects in the region, indicating a competitive pricing strategy [12][13]. - The equipment investment per unit capacity is 320.23 yuan per square meter, which aligns with the average of comparable projects in the industry [11][13].