Workflow
Port
icon
Search documents
客流“双破亿”!粤港澳“三联通”持续提升
Bei Jing Wan Bao· 2026-01-08 11:42
Core Insights - The cumulative passenger flow through the Hong Kong-Zhuhai-Macao Bridge and the Guangzhou-Shenzhen-Hong Kong Express Rail Link has surpassed 100 million, indicating a significant enhancement in connectivity among the Guangdong-Hong Kong-Macao Greater Bay Area [1][2] Infrastructure Development - The Greater Bay Area has six major cross-river and cross-sea channels completed, including the Hong Kong-Zhuhai-Macao Bridge, which has drastically reduced travel time between Hong Kong and Zhuhai/Macao from 3 hours to approximately 45 minutes [2] - The Guangzhou-Shenzhen-Hong Kong Express Rail Link allows travel from Guangzhou South Station to Hong Kong West Kowloon Station in under 50 minutes and from Shenzhen Futian Station to Hong Kong in about 15 minutes [1][2] Policy and Regulation - Recent policies such as "Hong Kong vehicles northbound" and "Guangdong vehicles southbound" have been implemented, facilitating smoother cross-border travel and enhancing the integration of the Greater Bay Area [2][3] - The introduction of smart border control measures, including facial recognition and fingerprint scanning, has significantly simplified the crossing process, reducing wait times to around 10 seconds [3] Economic and Social Integration - The increase in passenger flow reflects the realization of the "one-hour living circle" concept, promoting the seamless movement of talent, capital, and innovation across the Greater Bay Area [2] - Enhanced infrastructure and supportive policies are fostering closer interactions among residents, contributing to a more integrated community within the Greater Bay Area [3][4]
水陆齐进加速织就立体交通网
Xin Lang Cai Jing· 2026-01-07 22:24
Core Insights - The transportation infrastructure in Qiannan Prefecture is undergoing significant development, with multiple projects expected to enhance connectivity and support economic growth by 2025 [1][2] Group 1: Highway and Waterway Developments - The Gui-Ping Expressway has recently opened, and the Lijiang River Expressway is on track for completion in the first half of 2026 [1] - The Weng'an Port, set to operate in 2025, will be the first automated terminal in Guizhou, significantly improving water transport efficiency [1] - The construction of the Longtan Hydropower Station's navigation facilities is underway, facilitating the full resumption of navigation on the Hongshui River [1] Group 2: Railway Infrastructure Expansion - The Wengma Railway's southern extension has been successfully completed, and the Gui-Gui Railway's second line is under construction with a total investment of 17.28 billion [1] - The total railway mileage in Qiannan has reached 805 kilometers, with high-speed rail accounting for 428 kilometers, positioning the region second in total railway length and first in high-speed rail in the province [1] Group 3: Road Network Improvements - In 2025, 22 projects for upgrading national and provincial roads and constructing rural roads are in progress, covering a total of 454 kilometers, with 283 kilometers already completed [2] - The accessibility of rural roads has improved significantly, with 90% of the 87 townships now connected to roads above the third level, facilitating the transport of agricultural products [2] Group 4: Overall Impact on Economic Development - The comprehensive development of the transportation network in Qiannan is expected to enhance regional connectivity and expand development opportunities, supporting high-quality economic and social growth [2]