Workflow
防汛备汛
icon
Search documents
我国南方即将进入主汛期,防汛备汛进展如何?
Xin Hua Wang· 2025-05-26 09:28
Core Viewpoint - The southern region of China is expected to enter the main flood season starting June 1, with the Ministry of Water Resources emphasizing the importance of flood prevention and preparedness measures [1] Rainfall and Water Conditions - Nationwide precipitation has been generally below average, with a mean rainfall of 138 mm as of May 22, which is 11% lower than the historical average of 155 mm [2] - Major river systems are experiencing a 30% decrease in runoff compared to the same period last year, with specific reductions in the Yangtze and Huai rivers ranging from 20% to 60% [2] - Despite localized heavy rainfall, the overall flood situation in major rivers remains stable, with 38 rivers experiencing floods above warning levels, most of which have receded below warning levels [2] Flood Prevention and Preparedness - In Guangdong, flood prevention preparations are underway, including detailed inspections of key water infrastructure [3] - As of May 20, 3,934 out of 4,257 key water damage repair projects have been completed, with the remaining projects expected to be finished by the end of June [3] - The Ministry of Water Resources has issued 24 meteorological warnings for mountain flood disasters and 244 flood and drought warnings to relevant authorities and the public [3][4] Future Flood Predictions - Predictions indicate that from June to August, several river basins, including the Yangtze and Yellow Rivers, may experience above-average rainfall, while some areas may face drought conditions [5] - Specific regions such as the middle reaches of the Yellow River and parts of the Huai River are at risk of significant flooding during the main flood season [5] Goals for Flood and Drought Management - The Ministry of Water Resources aims to ensure water supply for urban residents and agricultural irrigation, with specific targets to prevent casualties and infrastructure damage during the flood season [6]
省委常委会召开会议认真学习贯彻习近平总书记重要讲话重要指示精神研究进一步做好我省防汛备汛、“十五五”规划编制、残疾人事业发展等工作黄坤明主持会议
Group 1 - The meeting emphasized the importance of Xi Jinping's recent speeches and directives for the high-quality development and modernization of Guangdong, highlighting the need for collaboration with Henan to promote strategic initiatives such as the Guangdong-Hong Kong-Macao Greater Bay Area and ecological protection in the Yellow River basin [1] - There is a focus on enhancing industrial development through experience sharing and mutual cooperation, particularly in sectors like smart manufacturing, electronic information, and hydrogen energy, while also promoting high-quality agricultural products and cultural tourism resources [1] - The meeting called for deepening social and livelihood cooperation, including strengthening connections between high-level universities and medical institutions, optimizing services for studying and medical treatment across regions, and enhancing labor cooperation [1] Group 2 - The meeting underscored the necessity for meticulous preparations for flood prevention and disaster relief, especially as the province enters a period of significant rainfall, with a strong emphasis on safeguarding the lives and property of the populace [2] - It was highlighted that all levels of government must implement comprehensive flood defense measures, closely monitor disaster-prone areas, and ensure timely and accurate weather warnings to minimize casualties [2] Group 3 - The meeting stressed the importance of adhering to Xi Jinping's directives for the preparation of the 14th Five-Year Plan, emphasizing the need for a high-quality planning process that reflects both domestic and global perspectives [3] - Key principles for the planning process include balancing current needs with long-term goals, integrating strategic and operational considerations, and ensuring scientific, democratic, and legal decision-making [3] Group 4 - The meeting highlighted the need to enhance services and support for people with disabilities, aiming to promote their full participation in Guangdong's modernization efforts [4] - There is a call for improving the institutional framework for disability services, advancing barrier-free environment construction, and fostering innovation in assistive technology [4] - The meeting also emphasized the importance of increasing the self-development capabilities of individuals with disabilities through employment support and public awareness campaigns [4]
我市加快推进长江堤防应急治理工程民生实事项目——合力攻坚筑牢长江堤防“生命线”
Zhen Jiang Ri Bao· 2025-05-21 23:57
Core Viewpoint - The Jiangsu Province is implementing emergency governance projects for the Yangtze River embankments to ensure public safety during the flood season, with significant investments and progress reported in various districts [1][2][3][4]. Group 1: Emergency Governance Projects - The total investment for the emergency governance project in the Danhu District is approximately 88.39 million yuan, focusing on flood prevention and infrastructure improvements [2]. - The Yangzhong City project has a total estimated investment of 154 million yuan, with the first phase involving 13.46 kilometers of embankment reinforcement and the renovation of 17 hazardous structures [3][4]. - The overall investment for the second phase of the Yangzhong project is around 72 million yuan, which includes additional flood prevention infrastructure [4]. Group 2: Progress and Completion Status - As of May 21, the first phase of the emergency governance project in Danhu has reached a completion rate of 95%, with significant construction milestones achieved [2]. - The Yangzhong project is expected to complete its main construction by the end of May, with ongoing earthworks and structural installations [3][4]. - By the end of April, the overall investment in other key flood prevention projects in the city reached 57.25 million yuan, accounting for 80.6% of the annual target [5]. Group 3: Challenges and Solutions - The construction teams in Danhu faced challenges such as complex geological conditions and the relocation of power lines, which were addressed through collaborative efforts and real-time adjustments to construction plans [7]. - The emphasis on quality assurance in the construction of the embankments is critical, as these structures are vital for protecting public safety [7][8]. - The need for comprehensive preparations and resource management is highlighted to ensure effective flood response capabilities [8].
山东威海机场多措并举做好防汛备汛工作
Core Viewpoint - The Weihai Airport management group is proactively preparing for flood prevention and response measures as the rainy season approaches, ensuring safe operations and smooth travel for passengers [1][2][3] Group 1: Flood Prevention Measures - The airport has revised and updated its emergency response plan for flood and typhoon situations, clarifying departmental responsibilities and response processes to ensure quick and coordinated action during flood events [2] - Comprehensive inspections of drainage facilities in the flight area have been conducted to address issues such as water accumulation, blockages, leaks, and damage, ensuring the drainage system is fully operational during flood periods [2] - The airport has strengthened its 24-hour duty and information reporting system, enhancing real-time monitoring and issuing weather alerts tailored to local conditions [3] Group 2: Emergency Preparedness and Response - The airport has organized disaster response drills to test the feasibility and effectiveness of the emergency plans, improving overall emergency response capabilities [2] - A thorough inventory check of flood prevention materials has been conducted, ensuring adequate supplies of sandbags and other resources are available for immediate use [2] - The airport is committed to providing special services for vulnerable passenger groups, including the availability of wheelchairs and blankets, and has coordinated with airlines to manage potential flight delays [3] Group 3: Communication and Passenger Services - Real-time updates on flight information are communicated through terminal displays and announcements, keeping passengers informed [3] - The airport has established a comprehensive safety barrier for flood prevention through enhanced responsibility, hazard identification, resource allocation, service optimization, and information transparency [3]
李国英率国家防总检查组检查湖南湘江、资水流域防汛备汛工作
Shui Li Bu Wang Zhan· 2025-05-08 18:13
Group 1 - The core message emphasizes the importance of implementing flood prevention measures and adhering to the directives of the central government to ensure public safety and stability during flood seasons [1][2][3] - The inspection team, led by the Minister of Water Resources, focused on assessing flood prevention work in various regions, including the Xiangjiang and Zishui river basins, and identified weaknesses in current flood control measures [1][2] - A modern rainwater monitoring and forecasting system is to be established, integrating satellite, radar, and hydrological networks to enhance flood prediction accuracy and extend the forecast period [2][3] Group 2 - The need for a comprehensive defense system that includes responsibility allocation, decision support, and command coordination is highlighted to ensure effective flood management [3] - Emphasis is placed on the importance of early warning systems and organized evacuation plans to protect vulnerable populations from potential flood risks [3] - The management of small and dangerous reservoirs, as well as key levees, is crucial for flood preparedness, with a focus on proactive measures and early detection of potential hazards [3]
周海兵督导检查防汛备汛并开展巡河
Chang Sha Wan Bao· 2025-05-04 01:51
Core Points - The government emphasizes the importance of flood prevention and disaster relief, urging all levels of departments to implement Xi Jinping's important discourse on the subject [1] - The focus is on enhancing the construction and management of flood control infrastructure, particularly the Su Liao Yuan levee project, which protects 15,000 residents and covers an area of 20,850 acres [5] - There is a call for improved ecological protection and biodiversity in the Xiangjiang River basin, alongside the development of tourism resources [5][6] Group 1 - The government is committed to ensuring the safety of rivers and lakes through comprehensive flood prevention measures [1] - The Su Liao Yuan levee project is expected to be completed this month, highlighting the urgency of flood control infrastructure development [5] - The need for real-time monitoring of riverbank hazards and the establishment of a management mechanism is emphasized [5] Group 2 - The government acknowledges the complex and severe meteorological conditions this year, urging departments to prioritize public safety [6] - Key actions include accelerating levee repairs, enhancing personnel and material support, and improving weather and water level forecasting systems [6] - There is a strong emphasis on inter-departmental collaboration and rigorous oversight to ensure effective flood prevention measures [6]
广东水利严阵以待保安澜
Shui Li Bu Wang Zhan· 2025-04-22 03:11
Core Viewpoint - Guangdong Province has initiated a comprehensive flood prevention and drought management strategy for the 2025 flood season, emphasizing the importance of preparedness and responsibility at all levels of the water management system [1][2][3]. Group 1: Flood Prevention Measures - The provincial water resources department has organized training for approximately 100,000 personnel to ensure readiness for flood response [2][3]. - A series of specific tasks have been outlined to enhance flood safety, focusing on early preparation and detailed planning [1][2]. - The province has established a robust responsibility system, with local government leaders accountable for flood prevention efforts [3]. Group 2: Emergency Preparedness - A large-scale emergency drill was conducted to test the effectiveness of flood response strategies, involving multiple agencies and focusing on real-time coordination [4][5]. - The provincial water resources department has developed comprehensive flood control plans, including emergency response protocols for extreme weather events [5][6]. - The province has pre-positioned emergency response teams and resources, with 48,600 personnel and 700 million yuan worth of emergency supplies ready for deployment [7]. Group 3: Infrastructure and Risk Management - Significant investments are being made in water infrastructure, including the repair of 314 key flood control projects and the initiation of new major water projects [6]. - A systematic inspection process has been implemented to identify and rectify potential risks in flood management systems [6]. - The establishment of a collaborative mechanism for information sharing and joint decision-making among various agencies is being prioritized to enhance flood response capabilities [4][6].