十四五水利建设
Search documents
“十四五”时期水利基础设施建设全面提速 淮河流域新增水库库容25亿立方米
Ren Min Ri Bao· 2026-02-01 22:32
Core Insights - The investment in the Huai River management during the "14th Five-Year Plan" period reached 606 billion yuan, which is 1.63 times that of the "13th Five-Year Plan" period, indicating a significant acceleration in water conservancy infrastructure development [1] - All 38 projects identified by the State Council for further Huai River management have commenced, with 17 projects completed by the end of the "14th Five-Year Plan" [1] - The capacity of newly constructed reservoirs in the Huai River basin has increased by 2.5 billion cubic meters, with flood control capacity rising by 1.09 billion cubic meters [1] Investment and Infrastructure Development - A total investment of 606 billion yuan was completed for Huai River management, marking a substantial increase compared to the previous five-year period [1] - The construction of flood control projects and the establishment of a rainwater monitoring and forecasting system are progressing rapidly [1] Water Resource Management - The total water consumption in the Huai River basin is maintained within 72.4 billion cubic meters, with groundwater extraction reduced by over 15% compared to the end of the "13th Five-Year Plan" [2] - The effective utilization coefficient of irrigation water for farmland reached 0.609, with water consumption per unit GDP and industrial added value significantly better than the national average [2] Ecological Protection and Monitoring - The health assessment of rivers and lakes in the Huai River basin has been completed, with the establishment of 125 happiness rivers and lakes at the basin level and over 2,200 at the provincial and municipal levels [1] - The area of soil erosion in the basin has decreased by 4,006 square kilometers, with the soil conservation rate improved to 91.3% [1]
青春华章|一组数据看“十四五”水利建设“成绩单”
Ren Min Wang· 2025-09-29 13:57
Core Insights - The "14th Five-Year Plan" has led to significant advancements in water conservancy construction in China, with an expected investment exceeding 5.4 trillion yuan, which is 1.6 times that of the "13th Five-Year Plan" [1][2] Group 1: Investment and Projects - A total of 172 major water conservancy projects have commenced since the start of the "14th Five-Year Plan" [2] - The average annual use of non-fiscal funds has reached 395.7 billion yuan, which is 2.3 times that of the "13th Five-Year Plan" [2] Group 2: Disaster Management and Ecological Impact - The proportion of economic losses from flood disasters has decreased from 0.28% during the "13th Five-Year Plan" to 0.18% in the current period [2] - Key rivers such as the Grand Canal and the Xiliao River have been fully restored, achieving an ecological flow compliance rate of 98.6% [2] Group 3: Water Resource Efficiency - By the end of the "14th Five-Year Plan," the national water network coverage is expected to reach 80.3%, with irrigated farmland area at 1.09 billion mu and rural tap water coverage at 96% [2] - Water usage per unit of GDP and industrial added value is projected to decrease by 17.7% and 23.6%, respectively, compared to the end of the "13th Five-Year Plan" [2] - The effective utilization coefficient of irrigation water in farmland has improved from 0.565 to 0.58 [2]