国家清洁能源基地
Search documents
云南能源绿色低碳转型成效显著,国家清洁能源基地基本建成
Zhong Guo Xin Wen Wang· 2025-10-13 00:54
Core Insights - Yunnan Province has achieved significant growth in its power generation capacity, with total installed capacity exceeding 167 million kilowatts, a 61.8% increase compared to the end of the 13th Five-Year Plan [1] - The province leads the nation in green power generation, with over 150 million kilowatts of installed green power capacity, and has established a national clean energy base [1] - Yunnan's energy transition has shown remarkable progress, with renewable energy installations surpassing 68 million kilowatts, making it the second-largest power source after hydropower [1][2] Group 1: Green Energy Development - Yunnan has a strong complementary relationship among hydropower, wind, and solar energy, with over 200 million kilowatts of clean energy resources available for development [1] - The province has six of the top ten hydropower stations in the country, contributing to the world's largest clean energy corridor alongside the Three Gorges and Gezhouba hydropower stations [1] - By 2025, Yunnan's total power generation is expected to reach 490 billion kilowatt-hours, with green power accounting for over 85% of the total [1] Group 2: Traditional Energy Supply - From 2021 to 2024, Yunnan's raw coal production is projected to increase from 57.96 million tons to 66.12 million tons, and crude oil processing capacity is expected to rise from 9.76 million tons to 11.56 million tons [2] - The construction of a second cross-province natural gas pipeline is underway, which will diversify the natural gas supply in Yunnan [2] - The establishment of emergency gas supply centers in Yuxi and Qujing marks a significant step in achieving large-scale reserves of natural gas and oil [2] Group 3: Energy Infrastructure and Future Plans - Yunnan has transmitted a cumulative 650 billion kilowatt-hours of electricity to eastern regions, supporting their economic development and energy conservation efforts [2] - The province aims to accelerate the construction of a national clean energy base and a regional green energy hub during the 15th Five-Year Plan period [2] - By 2030, Yunnan plans to establish a new type of power system and achieve significant progress in green energy development [2]