无人化智能掘进
Search documents
重大进展!我国自主研制,突破万米大关!
Xin Lang Cai Jing· 2025-12-20 10:53
Core Viewpoint - The successful breakthrough of the "Linghao" shield machine at the Chongtai Yangtze River Tunnel marks a significant step towards achieving a high-speed rail connection across the Yangtze River, with a target speed of 350 km/h [1][3] Group 1: Project Details - The "Linghao" shield machine is approximately 148 meters long, weighs about 4,000 tons, and features a 15.4-meter diameter cutter head, showcasing advanced autonomous capabilities for intelligent tunneling [3] - The Chongtai Yangtze River Tunnel is a critical component of China's "eight vertical and eight horizontal" high-speed rail network, connecting Chongming District in Shanghai with Taicang City in Jiangsu Province [3] - The total length of the tunnel is 14.25 kilometers, with the shield section measuring 13.201 kilometers, making it the largest and highest standard high-speed rail underwater tunnel project globally [3] Group 2: Economic Impact - Upon completion, the tunnel will significantly reduce travel time between cities along the Yangtze River, enhancing connectivity for cities like Shanghai, Nanjing, and Hefei [3] - The project is expected to play a vital role in the development of the "Railway on the Yangtze River Delta," contributing to the high-quality growth of the Yangtze River Economic Belt [3]
世界最大直径高铁盾构机掘进突破万米大关
Ke Ji Ri Bao· 2025-12-17 02:47
Core Insights - The "Linghao" shield machine has achieved a significant milestone by surpassing 10,000 meters in excavation, with only 1,000 meters remaining to reach the southern bank of the Yangtze River, marking a major progress in the world-class cross-river tunnel project [1] Group 1: Project Overview - The Chongtai Yangtze River Tunnel is a key project for the high-speed rail connecting Shanghai, Nanjing, and Hefei, with a total length of 14.25 kilometers, including a shield section of 13.2 kilometers designed for dual-track operation [1] - The tunnel will allow high-speed trains to cross the Yangtze River without reducing speed, showcasing advanced engineering capabilities [1] Group 2: Technical Achievements - The tunnel features several world records, including the longest single-shield excavation length of 11.3255 kilometers, the highest operational speed of 350 kilometers per hour for an underwater tunnel, and the deepest underwater tunnel at 89 meters below the Yangtze River [1] - The "Linghao" shield machine, measuring 148 meters in length and weighing approximately 4,000 tons, is equipped with a 15.4-meter diameter cutter head, the largest globally, and incorporates the advanced I-TBM system for intelligent excavation [2] Group 3: Industry Impact - The achievement of over 10,000 meters of continuous excavation by a 15-meter diameter shield machine represents a historic leap for China, transitioning from a position of "catching up" to "leading" in this field [2]
世界最大直径高铁盾构机“领航号”掘进突破万米大关
Ke Ji Ri Bao· 2025-12-16 06:27
Core Viewpoint - The successful breakthrough of the "Pioneer" shield machine in the Chongtai Yangtze River Tunnel marks a significant step towards achieving a high-speed rail crossing of the Yangtze River at a speed of 350 km/h, with only 1.3 kilometers remaining to reach the southern bank of the river [1]. Group 1: Project Overview - The Chongtai Yangtze River Tunnel is a key project in China's "Eight Vertical and Eight Horizontal" high-speed railway network, connecting Chongming District in Shanghai with Taicang City in Jiangsu Province [2]. - The tunnel has a total length of 14.25 kilometers, with the shield section measuring 13.201 kilometers, featuring a maximum single-head excavation distance of 11.325 kilometers from the third to the second shaft [2]. - The tunnel is characterized by its large diameter of 15.4 meters, a water depth of 89 meters, and a design speed of 350 km/h, making it the highest standard, longest excavation distance, and largest scale high-speed rail river crossing project in the world [2]. Group 2: Technological Advancements - The "Pioneer" shield machine is equipped with the world's most advanced brain system, the I-TBM system, which enables autonomous decision-making and intelligent analysis during the excavation process [1]. - Key technological features include adaptive pressure control within the shield chamber, cloud-based predictive data, autonomous navigation, and self-adjusting muck circulation, resulting in smoother operations compared to manual control [1]. - The project has achieved a world record for monthly excavation of 718 meters for 15-meter high-speed rail tunnels, demonstrating the effectiveness of fully algorithm-controlled, unmanned intelligent excavation [1].