水风光蓄多能互补
Search documents
中国黄河干流装机最大水电站单日发电量创新高
Zhong Guo Xin Wen Wang· 2025-09-03 15:23
Core Insights - The Malda Dam Hydropower Station has reached a peak generation period in September due to abundant water flow from the Yellow River, achieving a record daily output of 40.28 million kilowatt-hours on September 2, with an average load factor of 80% and a water utilization rate of 100% [1][3] Company Overview - The Malda Dam Hydropower Station, located in the Guoluo Tibetan Autonomous Prefecture of Qinghai Province, has a total installed capacity of 2.32 million kilowatts, making it the highest and largest hydropower station on the Yellow River [3] - It is a key project for China's "West-to-East Power Transmission" and "Qinghai Electricity into Henan" initiatives, serving as a backbone power source [3] Operational Strategy - The station has closely coordinated with the power grid, meteorological, and water resources departments to accurately predict water trends and dynamically optimize generation plans, maximizing water resource potential and fully releasing the station's capacity [3] - Maintenance of generation and transformation equipment, stability control systems, and grid connection lines has been prioritized to ensure operational efficiency during peak demand and flood season [3] Performance Metrics - As of now, the cumulative generation of the Malda Dam Hydropower Station has exceeded 3.2 billion kilowatt-hours in 2025, and since the first unit was connected to the grid on April 1, 2024, the total generation has surpassed 6.1 billion kilowatt-hours, all of which is 100% green energy [3]