Workflow
粤港澳大湾区轨道交通网络
icon
Search documents
深江铁路跨虎跳门水道斜拉桥双主塔施工进入冲刺阶段
Xin Lang Cai Jing· 2026-01-29 08:27
Core Viewpoint - The construction of the Guangzhongjiang Grand Bridge, a key project of the Shenjiang Railway, has successfully surpassed the 100-meter mark in the height of its dual main towers, marking a significant milestone in the construction phase [1][3]. Group 1: Project Overview - The Shenjiang Railway has a total length of 116 kilometers, with 98% of it consisting of bridges and tunnels [1]. - The project includes the construction of 13.41 kilometers of main line, the Jiangmen diversion line, and various other engineering tasks, including the erection of 455 double-line beams and 92 single-line beams [1]. - The main bridge of the Guangzhongjiang Grand Bridge spans approximately 590 meters, with a main span of 300 meters and tower heights of 131.5 meters and 140 meters [1][3]. Group 2: Construction Challenges and Innovations - The construction area is located in a first-class shipping channel with an average of nearly 300 vessels passing daily, presenting significant safety risks and high technical requirements [3]. - The project team has overcome the challenge of non-explosive excavation for deep-water bedrock foundations, a first in China for large-span bridges [3]. - Advanced technologies such as intelligent tower construction machines and BIM information modeling have been implemented to ensure safe and efficient construction [3]. Group 3: Regional Impact - The Shenjiang Railway is a crucial part of the Guangdong-Hong Kong-Macao Greater Bay Area's rail transit network, aiming to connect the Qianhai Free Trade Zone in Shenzhen with the Nansha Free Trade Zone in Guangzhou in just half an hour [3]. - The completion of the railway is expected to significantly shorten travel times, enhance the flow of people and goods, and promote balanced regional development [3].