综合运输
Search documents
前三季度跨区域人员流动量超五百亿人次
Ren Min Ri Bao· 2025-11-04 22:12
Core Insights - A series of major transportation projects are progressing rapidly, with significant investments in infrastructure and improvements in logistics efficiency [1][2][3] Group 1: Transportation Infrastructure Development - The Yanqi Yangtze River Bridge, the world's largest cable-stayed bridge, is nearing completion, expected to be finished by November [1] - The Xinjiang Wuwei Expressway, spanning 319.7 kilometers, is in the final stages, aiming for full operation by the end of this year [1] - The total investment in transportation fixed assets reached 2.6 trillion yuan in the first three quarters, with significant contributions from highways, railways, and waterways [1] Group 2: Personnel and Freight Movement - Cross-regional personnel flow reached 50.6 billion trips in the first three quarters, a year-on-year increase of 3.1% [2] - The total freight volume was 4.325 billion tons, reflecting a year-on-year growth of 3.89%, with notable increases in railway and highway freight [2] - Port cargo throughput grew by 4.6% year-on-year, with foreign trade container throughput showing resilience [2] Group 3: Innovations in Logistics - The "One Bill" system has streamlined logistics processes, significantly reducing costs and improving transport efficiency for exports [3] - The Ningbo Zhoushan Port has launched 111 container sea-rail intermodal routes, achieving over 1.5 million standard container units in business volume [3] - The Ministry of Transport plans to enhance the integration of container sea-rail intermodal transport, targeting an annual growth rate of around 15% by 2027 [3]