Workflow
高寒高铁智能化建造
icon
Search documents
跨越白山黑水 树起全新标杆
Liao Ning Ri Bao· 2025-10-10 00:59
Core Viewpoint - The opening of the Shenyang to Jiamusi high-speed railway marks a significant milestone in the Northeast high-speed rail network, enhancing regional connectivity and economic revitalization [1] Construction Challenges - The Shenyang to Baicheng section of the high-speed railway faced extreme geological and climatic challenges, including traversing 11 fault zones and crossing three major river systems with a bridge-tunnel ratio of 78.4% [2][3] - Construction was complicated by harsh winter conditions, with temperatures dropping to -30°C to -40°C, limiting effective working days to less than 200 per year [2] Innovative Solutions - The project utilized advanced construction techniques, such as a comprehensive water management strategy to address significant groundwater issues, achieving successful water blockage and setting new standards in tunnel construction [4][5] - The use of smart construction technologies, including a fully automated production line for track slabs, significantly improved efficiency and precision in manufacturing [8] Environmental Considerations - The project prioritized ecological balance, opting for tunnel construction to protect mature trees rather than traditional road-building methods, demonstrating a commitment to environmental stewardship [10][11] - Measures were implemented to minimize the impact on local communities and ecosystems, including sound barriers and dust suppression techniques during construction [11][12] Overall Impact - The completion of the Shenyang to Jiamusi high-speed railway not only enhances transportation efficiency but also symbolizes the technological advancements and ecological responsibility of China's infrastructure development [1][13]