Workflow
石油工程建设
icon
Search documents
中石化油服子公司中标国家石油天然气管网集团有限公司甬绍干线天然气管道西段工程施工总承包项目
Zhi Tong Cai Jing· 2025-09-12 08:25
该项目管道线路总长约120公里,项目建设对浙江省调整优化能源结构,拉动沿线地区经济发展,加快 形成全国天然气"一张网"具有积极推动作用,彰显公司在石油工程建设领域的专业技术水平和施工管理 能力。目前相关方尚未正式签署合同,该项目仍存在不确定性,敬请投资者注意投资风险。 中石化油服(600871)(01033)发布公告,近日,公司全资子公司中石化石油工程建设有限公司中标国 家石油天然气管网集团有限公司甬绍干线天然气管道西段工程施工总承包项目(该项目),中标金额为人民 币8.58亿元,约占公司中国会计准则下2024年营业收入的1.06%。 ...
中石化油服(01033)子公司中标国家石油天然气管网集团有限公司甬绍干线天然气管道西段工程施工总承包项目
智通财经网· 2025-09-12 08:24
Group 1 - The core point of the article is that Sinopec Oilfield Services (01033) announced that its wholly-owned subsidiary won a construction contract for the western section of the Yongshao natural gas pipeline project, with a bid amount of RMB 858 million, accounting for approximately 1.06% of the company's projected revenue for 2024 under Chinese accounting standards [1] - The total length of the pipeline project is approximately 120 kilometers, which is expected to positively impact the optimization of the energy structure in Zhejiang Province and stimulate economic development along the pipeline [1] - The project highlights the company's professional technical capabilities and construction management skills in the oil engineering construction sector [1] Group 2 - Currently, the contract has not been formally signed by the relevant parties, indicating that there is still uncertainty regarding the project [1]
石化油服(600871.SH):中标8.58亿元国家管网集团甬绍干线天然气管道西段工程施工总承包项目
Ge Long Hui A P P· 2025-09-12 08:21
Group 1 - The company, PetroChina Oilfield Services (600871.SH), announced that its wholly-owned subsidiary, Sinopec Petroleum Engineering Construction Co., Ltd., has won a bid for the construction project of the western section of the Ning-Shao natural gas pipeline, with a contract value of RMB 858 million, accounting for approximately 1.06% of the company's projected revenue for 2024 under Chinese accounting standards [1] - The project involves the construction of a pipeline approximately 120 kilometers long, which is expected to positively impact the optimization of the energy structure in Zhejiang Province, stimulate economic development in the surrounding areas, and accelerate the formation of a national natural gas network [1] - This achievement highlights the company's professional technical capabilities and construction management skills in the field of petroleum engineering construction [1]
中油工程2025上半年净利润下滑10.87%,资产负债率升至77.26%
Sou Hu Cai Jing· 2025-08-22 01:00
Core Viewpoint - 中油工程 reported a mixed performance in the first half of 2025, with revenue growth but a decline in net profit, indicating challenges in profitability despite increased sales [1][3]. Financial Performance - The company achieved an operating revenue of 36.287 billion yuan, representing a year-on-year increase of 12.18% [1]. - The net profit attributable to shareholders was 470 million yuan, reflecting a year-on-year decrease of 10.87% [1]. - Profitability indicators showed a decline, with net profit margin dropping from 1.63% in the first half of 2024 to 1.31% in 2025, and gross profit margin decreasing from 8.86% to 8.01% [3]. Operational Efficiency - The inventory turnover days improved to 79.46 days, a decrease of 14.56% compared to the same period last year, indicating better inventory management [5]. - The net cash flow from operating activities was -1.533 billion yuan, although this was a significant improvement from -7.052 billion yuan in the same period of 2024, it still indicates a need for better cash flow management [5]. - The asset-liability ratio increased to 77.26%, up 1.45 percentage points year-on-year, suggesting a heavier debt burden [5]. Institutional Investment - As of the first half of 2025, the number of institutions holding shares in 中油工程 decreased to 8, down from 113 in the same period of 2024, indicating a significant drop in institutional investor participation [7]. - The company's market capitalization was reported at 20.044 billion yuan, significantly lower than its peak of 54.045 billion yuan in May 2017, requiring a 169.64% increase in stock price to reach historical highs [7].
中原建工提升工艺管线预制率
Zhong Guo Hua Gong Bao· 2025-08-13 06:04
Core Insights - The successful trial operation of the shallow gas storage facility by Zhongyuan Construction Company marks a significant advancement in the automatic welding technology for small-diameter pipelines, achieving a prefabrication rate of over 58% [1] Group 1: Technology Improvements - Traditional automatic welding machines faced limitations in welding small-diameter pipes (less than 150mm), leading to reliance on manual welding with a qualification rate of only 82% [1] - Key improvements to the automatic welding machine included reducing the welding gun diameter from 50mm to 30mm, enhancing flexibility in narrow spaces, and upgrading the clamping device with pressure sensors for better control [1] - The upgraded welding machine reduced the single weld time from 40 minutes to 12 minutes, achieving a first-time qualification rate of 98.3% and reducing rework rates by over 90% [1] Group 2: Future Goals - The project manager indicated plans to further enhance prefabrication capabilities, aiming to increase the prefabrication rate of small-diameter pipelines to over 70% [2]
中油工程(600339.SH)子公司中标伊拉克海水管道项目 授标金额25.24亿美元
智通财经网· 2025-08-01 09:39
Core Viewpoint - China National Petroleum Engineering Company (600339.SH) has received a project award letter from Iraq's Basra Oil Company for the Basra seawater pipeline project, with a contract value of $2.524 billion (approximately 18.032 billion RMB) [1] Group 1 - The project involves the construction of seawater treatment facilities, main pipelines from the treatment facilities to various junction stations, and branch pipelines from junction stations to oil field distribution stations, along with associated ground facilities [1] - The contract duration is set for 54 months, which includes 42 months for design, procurement, construction, and trial operation, followed by 12 months for operation maintenance and training [1]
中油工程(600339.SH):子公司中标伊拉克海水管道项目
Ge Long Hui A P P· 2025-08-01 09:37
Core Viewpoint - China Petroleum Engineering (600339.SH) has received a project award for the Iraq Basra seawater pipeline project from Basra Oil Company (BOC), indicating a significant opportunity for the company in the international market [1] Group 1: Project Details - The awarded project involves the construction of seawater treatment facilities, main pipelines from treatment facilities to various junction stations, and branch pipelines from junction stations to oil field distribution stations, along with associated ground facilities [1] - The total contract value for the Iraq seawater pipeline project is approximately $2.524 billion (around 18.032 billion RMB) [1] - The project duration is set for 54 months, which includes 42 months for design, procurement, construction, and trial operation, followed by 12 months for operation maintenance and training [1]
石化油服中标35.97亿元天然气管道相关工程施工项目
Zhi Tong Cai Jing· 2025-07-30 09:11
Group 1 - The company, Sinopec Oilfield Service Corporation, announced that its wholly-owned subsidiary, Sinopec Petroleum Engineering Construction Co., Ltd., has won a bid for the construction of the Changchun-Shijiazhuang natural gas pipeline project, specifically for sections two, four, and five [1] - The total bid amount for the project is RMB 3.597 billion, which accounts for approximately 4.44% of the company's projected revenue for 2024 under Chinese accounting standards [1]
中石化油服(01033)子公司中标天然气管道工程项目
智通财经网· 2025-07-30 08:53
Core Viewpoint - Sinopec Oilfield Services (01033) has won a contract for the construction of a natural gas pipeline project, highlighting its expertise in the oil engineering construction sector [1] Group 1: Contract Details - The company’s wholly-owned subsidiary, Sinopec Petroleum Engineering Construction Co., Ltd., has been awarded the construction contract for the Changchun-Shijiazhuang natural gas pipeline project [1] - The total contract amount is RMB 3.597 billion, which accounts for approximately 4.44% of the company's projected revenue for 2024 under Chinese accounting standards [1] - The pipeline project spans approximately 659 kilometers and includes various construction works such as multiple stations, valve rooms, directional drilling, and crossings [1] Group 2: Project Timeline and Significance - The construction period for the project is estimated to be around 487 days [1] - This contract reflects the company's professional technical capabilities and construction management skills in the oil engineering construction field [1]
石化油服(600871.SH):中标35.97亿元工程项目
Ge Long Hui A P P· 2025-07-30 08:40
Core Viewpoint - The company, PetroChina Oilfield Services (600871.SH), has recently won a significant contract for the construction of a natural gas pipeline, highlighting its expertise in the oil engineering construction sector [1] Group 1: Contract Details - The company’s wholly-owned subsidiary, Sinopec Petroleum Engineering Construction Co., Ltd., has been awarded the construction contract for the Changchun-Shijiazhuang natural gas pipeline project [1] - The total contract value is approximately RMB 3.597 billion, which represents about 4.44% of the company's projected revenue for 2024 under Chinese accounting standards [1] - The pipeline construction will cover a length of approximately 659 kilometers and includes various construction works such as multiple stations, valve rooms, directional drilling, and crossings [1] Group 2: Project Timeline and Significance - The estimated construction period for the project is around 487 days [1] - This contract win demonstrates the company's professional technical capabilities and construction management skills in the oil engineering construction field [1]