Workflow
民航工程建设
icon
Search documents
民航专业工程首次实现四省(市)远程异地全流程电子化评标
民航局机场司相关负责人表示,下阶段,将进一步扩大远程异地评标试点项目范围,及时总结经验并出 台相关制度文件,持续优化完善民航专业工程招投标监管平台和电子交易平台,通过技术创新、制度完 善和强化监管,进一步优化民航招投标市场营商环境,推动民航招投标市场规范健康发展。(中国民航 报 记者方笑) 9月17日,民航专业工程建设项目开标评标活动迎来重要里程碑——民航局以广州公共资源交易中心为 评标主场,以西安市公共资源交易中心、上海市建设工程交易服务中心龙华评标区、成都市公共资源交 易服务中心双流区分中心为评标副场,顺利完成对"湖南空管甚高频设备更新工程工艺安装工程施工"项 目的远程异地开标评标,为常态化开展远程异地评标奠定了基础。 广州公共资源交易中心(民航局机场司供图) 为确保试点工作顺利开展,各相关单位提前筹备、积极协作。民航局信息中心组织四地交易中心多次开 展电子交易系统联调测试,重点攻克异地数据加密传输、多终端同步评审、音视频实时交互等技术难 点;民航专业工程质量监督总站和四地交易中心严格按照民航局有关通知要求,开展虚拟项目全流程推 演,反复演练优化应急响应流程;民航中南地区管理局作为主场行政监督部门进行现场 ...
中南空管局参展2025国际机场博览会暨第十届中国机场服务大会
Core Viewpoint - The 2025 International Airport Expo and the 10th China Airport Service Conference opened in Guangzhou, showcasing innovations and achievements in air traffic management and engineering construction [1] Group 1: Company Innovations and Achievements - The company highlighted its strengths in engineering construction, showcasing projects in communication navigation, system integration, and Building Information Modeling (BIM) technology [2] - The company presented innovative achievements in flight services, including the near-landing flight procedure design at Baiyun Airport, point merging technology, and simplified departure and arrival codes [3] - The company demonstrated its experience in implementing air traffic control projects at 42 airports nationwide, emphasizing the advantages of BIM technology in modern air traffic control infrastructure [2] Group 2: Technological Advancements - The near-landing flight procedure at Baiyun Airport is the first systematic solution in the domestic air traffic control industry, addressing operational challenges [3] - The point merging technology has been tested in regional control sectors, making it the first of its kind in Asia, paving the way for its broader application [3] - The self-developed integrated monitoring system by the company attracted significant attention, featuring capabilities for seamless integration of various equipment into a unified platform [3] Group 3: Future Directions - The company plans to continue focusing on practical work and innovation, enhancing technical capabilities and service quality to contribute to the high-quality development of civil aviation and world-class air traffic management [5]
民航专业工程首个远程异地全流程电子化评标项目顺利实施
Core Viewpoint - The successful completion of the remote electronic evaluation project for the Xi'an Xianyang International Airport Phase III expansion marks a significant breakthrough in the civil aviation construction sector, enhancing transparency and efficiency in the bidding process [1][2]. Group 1: Project Implementation - The project involved a collaborative evaluation process between the Xi'an Public Resource Trading Center and the Chengdu Public Resource Trading Service Center, utilizing an electronic trading platform and cloud meeting system for remote assessments [1]. - The evaluation was conducted by a committee of randomly selected experts from the civil aviation expert pool, ensuring an objective and fair assessment process [1]. Group 2: Regulatory Framework - The Civil Aviation Administration of China (CAAC) issued guidelines for the remote evaluation pilot project, establishing a special task force to oversee cross-regional cooperation among various trading centers [2]. - Preparatory work included system testing, process simulations, and emergency drills to ensure a smooth and secure evaluation process [2]. Group 3: Market Impact - The remote electronic evaluation method is expected to enhance fairness in the civil aviation bidding market, optimize expert resource allocation, and reduce overall costs for companies participating in the bidding process [2]. - The CAAC aims to standardize remote evaluations across regions, moving towards a unified national platform for civil aviation project bidding [2].