Workflow
充电优惠券
icon
Search documents
国家电网:粽香里的电力守护
Core Viewpoint - The State Grid Corporation of China has implemented "precise guarantee + innovative service" strategies to ensure reliable electricity supply during the Dragon Boat Festival, deploying extensive resources for emergency repairs and monitoring [1][2][3]. Group 1: Electricity Supply Assurance - During the Dragon Boat Festival, the State Grid organized 25,000 emergency repair teams, with over 203,200 personnel and 56,900 vehicles on standby to ensure reliable electricity supply [1]. - In Hubei's Zigui County, the company utilized drone inspections and data analysis to preemptively address power supply challenges for 11 cultural events [2]. - The company established a "centralized monitoring + three-dimensional inspection" system to safeguard power supply in tourist areas, utilizing real-time monitoring and drone inspections to identify potential risks [3]. Group 2: Event Support and Infrastructure - The State Grid's Mianyang branch conducted thorough inspections of transformers and power lines in preparation for local events, ensuring safety and reliability [4]. - The company deployed emergency power vehicles and personnel to key areas during the Dragon Boat races, implementing a "group care, segment responsibility" mechanism for power supply [4]. Group 3: Green Travel Initiatives - The State Grid's smart vehicle networking platform predicted a 20% increase in charging volume during the festival, with expected service charging exceeding 67 million kilowatt-hours [5]. - The company identified 5,165 key charging stations for enhanced support, conducting inspections and ensuring optimal conditions for electric vehicle charging [5]. - In Beijing, the State Grid maintained charging stations at 22 highway service areas and 29 popular tourist spots to meet the increased demand [6]. Group 4: Infrastructure Development - The State Grid is advancing 140 key projects to enhance summer electricity supply capacity, with significant construction activities ongoing [7]. - In Shanghai, a critical upgrade to the 500 kV Gu Lu-Yang Gao line was completed, utilizing new composite wire technology to improve network efficiency [8]. - In Fujian, construction teams are actively working on a 500 kV substation, ensuring precise monitoring and adherence to safety standards during the project [8].