Workflow
地热能供暖(制冷)
icon
Search documents
济南起步区推进分布式光伏开发利用,实现并网装机容量约4.4万千瓦
Qi Lu Wan Bao· 2025-08-28 06:46
Core Viewpoint - Jinan City is accelerating the construction of the "Chatou Heating into Jinan" northern long-distance heating project, emphasizing the comprehensive utilization of geothermal energy and reinforcing its commitment to green transformation and high-quality development [1] Group 1: Energy Infrastructure Development - The Jinan New and Old Kinetic Energy Conversion Pilot Zone has been approved as a provincial-level pilot for energy green and low-carbon transformation, a provincial-level green electricity industrial park, and the only comprehensive smart energy pilot in the province [1] - New energy infrastructure projects include the completion and operation of a 500 kV pilot substation and a 110 kV Houchen substation, with an "H" type network framework expected to take shape by the end of this year [1] Group 2: Renewable Energy Initiatives - The pilot zone is actively promoting distributed photovoltaic development, achieving a grid-connected installed capacity of approximately 44,000 kW, with an expected annual power generation of about 50 million kWh [1] - The construction of the "Chatou Heating into Jinan" northern long-distance heating project is underway, alongside the establishment of three combined heating and cooling projects utilizing shallow geothermal energy at Shandong University Second Hospital [1]