新能源纯电动公交客车
Search documents
1.2亿元客车招标大单被TA独家拿下!
第一商用车网· 2025-10-13 10:00
近日,四川自贡市新能源纯电动公交客车采购项目成交公告发布。公告显示,一标段和二标 段中标人均为中通客车股份有限公司。据此前招标公告,第一包和第二包采购车辆合同总价 款不超过1.2亿元。 新能源纯电动公交客车采购项目成交公告 (招标编号:GYGL-SCZC-2025004) 一、中标人信息: 标段(包)[001]第一包采购新能源纯电动公交客车(车长 10500-11000mm,电量超过 250 千瓦时,全承载式车身,低入口或低地板): 中标人:中远客车股份有限公司 其他类型中标价: / 标段(包)[002]第二包采购新能源纯电动公交客车(车长 10500-11000mm,电量超过 300 千瓦时,全承载式车身,低入口或低地板): 中标人:中通客车股份有限公司 二、其他: 一、项目信息 项目名称:新能源纯电动公交客车采购项目。 项目编号:GYGL-SCZC-2025004。 采购方式:竞争性磋商。 成交服务内容: 第一包采购新能源纯电动公交客车(车长 10500-11000mm,电量超过250千瓦时,全承载式 车身,低入口或低地板);第二包采购新能源纯电动公交客车(车长10500-1100mm,电量 超过 300 ...
1.2亿元新能源客车采购项目延期!
第一商用车网· 2025-09-28 07:00
Core Viewpoint - The procurement project for new energy pure electric buses in Zigong City has been postponed to allow potential bidders more preparation time, ensuring an orderly bidding process [1][3][4]. Group 1: Project Overview - The project involves the procurement of two packages of new energy pure electric buses, with specifications including a vehicle length of 10,500-11,000 mm and battery capacities exceeding 250 kWh for the first package and 300 kWh for the second package [1][7][15]. - The total contract price for both packages will not exceed 120 million yuan [2][13]. Group 2: Funding and Procurement Details - Funding for the project comes from government special bonds, with funds allocated from September 2025 to April 2026 specifically for vehicle procurement [2][14]. - The procurement will prioritize the second package, with a minimum of 60 vehicles to be purchased before utilizing remaining funds for the first package [2][13]. Group 3: Bidding Process - The sale of competitive negotiation documents has been extended to September 30, 2025, with the submission deadline for response documents and negotiation time adjusted to October 9, 2025 [1][4][18]. - Bidders must meet specific qualifications, including having independent legal status, good commercial reputation, and relevant technical capabilities [7][15][16].
1.2亿巨资采购一批纯电动公交车!
第一商用车网· 2025-09-18 06:48
Core Viewpoint - The article discusses the procurement project for pure electric buses by the Zigong Public Transport Group in Sichuan Province, highlighting the specifications, funding sources, and requirements for suppliers [1][7]. Procurement Project Overview - The project involves the procurement of pure electric buses divided into two packages: the first package requires buses with a length of 10,500-11,000 mm and a battery capacity exceeding 250 kWh, while the second package requires buses with a length of 10,500-11,000 mm and a battery capacity exceeding 300 kWh [1][8]. - The total contract price for both packages will not exceed 120 million yuan [1]. Funding and Financial Details - The funding for the project will come from government special bonds, with the funds expected to be available from September 2025 to April 2026 [1][7]. - The procurement will prioritize the second package, with a minimum of 60 buses to be purchased from this package before any funds are allocated to the first package [1][8]. Supplier Requirements - Suppliers must have independent legal status, good commercial reputation, and the necessary technical capabilities to fulfill the contract [8]. - Suppliers must also have completed at least one project supplying new energy buses since 2022, with relevant documentation required [4][9]. - Joint bids are not allowed for this project [4][10]. Bid Submission and Timeline - The timeline for obtaining bidding documents is from September 17 to September 26, 2025, with a submission deadline for bids set for September 28, 2025 [5][11]. - Bids must be submitted in person at the specified location, and electronic submissions will not be accepted [11]. Contact Information - The procurement is managed by the Zigong Public Transport Group, with contact details provided for inquiries [12][13].
110辆新能源公交车招标结果公布 谁中标?
第一商用车网· 2025-07-02 15:56
Core Viewpoint - The procurement project for 110 new energy pure electric buses in Zigong City has been successfully completed, with Yutong Bus and Zhongtong Bus winning the bids for different packages [1][2]. Group 1: Project Overview - The project involves the procurement of 110 new energy pure electric buses, with the first package consisting of 4 buses measuring 8500-9000mm and the second package consisting of 106 buses measuring 10450-11000mm [1][3]. - The bid number for the project is GYGL-SCZC-2025001, and the public announcement period ends on July 3, 2025 [2][3]. Group 2: Bid Results - For the first package, Yutong Bus won with a bid of 2.48 million yuan, achieving a comprehensive score of 92.29 [5][6]. - Zhongtong Bus won the second package with a bid of 6.89 million yuan and a comprehensive score of 91.07 [6][7]. - Other notable bidders for the first package included Jinlong United Automotive with a bid of 2.51 million yuan and a score of 87.09, and CRRC Times Electric with a bid of 2.58 million yuan and a score of 85.46 [5][6]. - In the second package, Jinlong United Automotive and Zhongtong Bus were also among the bidders, with scores of 87.1 and 86.79 respectively [6][7]. Group 3: Bidder Information - Zhongtong Bus's project leader is Luo Hang, while Yutong Bus's project leader is Sun Weidong [4]. - Both winning bidders met the qualification requirements as specified in the tender documents [4]. Group 4: Contact Information - The procurement is managed by Zigong Public Transport Group, located at Huichuan Road, Zigong City, with contact persons Mr. Yang and Mr. Yuan [8][11]. - The procurement agency is Zigong Gongyuan Enterprise Management Co., Ltd., located at Yantian District, Zigong City [8][11].
这一地招标110辆纯电动公交车!
第一商用车网· 2025-06-21 04:31
Core Viewpoint - The procurement project for 110 pure electric buses in Zigong City, Sichuan Province, aims to enhance public transportation with government funding sourced from special bonds [1][3][10]. Group 1: Project Overview - The project is divided into two packages: the first package includes 4 buses (length 8500-9000mm) and the second package includes 106 buses (length 10450-11000mm), both featuring a full-load body and low-entry or low-floor design [4][10]. - The funding for this project comes from government special bonds, indicating a public investment in sustainable transportation [3][10]. Group 2: Bidding Process - The bidding process is open and will take place from June 21, 2025, to June 30, 2025, with a bid document fee of 300 RMB [8][13]. - Bids must be submitted by July 1, 2025, at 15:00, at the designated location in Zigong City [9][15]. Group 3: Bidder Qualifications - Bidders must be legally registered entities with independent legal status, good commercial reputation, and the necessary technical capabilities [5][11]. - Specific requirements include having no major legal violations in the past three years and being listed as a legitimate manufacturer in the relevant government announcements [6][12].