Workflow
柔性交流输电系统(FACTS)
icon
Search documents
越动工兴建国家电力调度中心
Shang Wu Bu Wang Zhan· 2025-08-26 04:10
Core Viewpoint - Vietnam is significantly expanding its power generation capacity and modernizing its electricity infrastructure to meet future energy demands, with a focus on renewable energy sources and advanced technologies [1] Group 1: Power Generation Capacity - According to the adjusted eighth power plan, Vietnam's total installed power capacity is expected to reach approximately 150,000 megawatts by 2030, nearly double the current capacity [1] - Renewable energy is projected to account for 36% of the total capacity by 2030, with an increase to 75% by 2050 [1] Group 2: Demand and Infrastructure Development - Peak load demand is anticipated to double by 2030 and increase to 4-5 times the current level by 2050 [1] - To accommodate this growth, the 220-500 kV transmission system must be expanded, with construction and renovation expected to be twice the current volume by 2030 [1] Group 3: Technological Advancements - The project emphasizes the need for investment in modern technologies such as nuclear power, Flexible AC Transmission Systems (FACTS), High Voltage Direct Current (HVDC), and Battery Energy Storage Systems (BESS) [1] - A modern control center capable of high-precision real-time monitoring of the power system is essential for integrating these advanced technologies and regional grid interconnections [1] Group 4: Project Details - The National Electricity and Northern Power Dispatch Center project is located in Hanoi, covering an area of 3,810 square meters, with a total construction area of over 39,000 square meters [1] - The total investment for the project is approximately 87 trillion Vietnamese Dong (around 33 million USD), with an expected completion date in 2028 [1]