羰基尾料铂族金属高效分离提取技术产业化项目
Search documents
【强信心 看发展】国内首条羰基尾料规模化处理生产线投产
Xin Lang Cai Jing· 2026-01-11 01:43
Core Insights - The article highlights the successful launch of China's first large-scale carbonyl tailings processing production line by Jinchuan Group, marking a significant advancement in the efficient recycling of precious metals and green low-carbon development [1][2]. Group 1: Project Overview - The carbonyl tailings processing line is part of a major technological transformation project with a total investment of 127 million yuan, initiated in September 2024 and expected to be completed by December 28, 2025 [1]. - The project aims to efficiently separate and extract scarce platinum group metals such as platinum, palladium, rhodium, ruthenium, and iridium from complex carbonyl tailings, enhancing the strategic resource recovery capabilities of the company [1]. Group 2: Environmental Initiatives - Concurrently, the "Precious Metal Waste Gas Centralized Treatment Project" is a key technological upgrade for Jinchuan Group in 2025, with an investment of 49.96 million yuan, which began construction in April 2025 [2]. - This project focuses on centralized and in-depth treatment of waste gas emissions from the precious metal production system, reinforcing the company's commitment to environmental protection and sustainable development [2]. Group 3: Challenges and Solutions - During the construction of these projects, the company faced technical integration challenges across metallurgy, construction, chemical, and electromechanical installation sectors, along with tight schedules and complex site operations [2]. - The construction team optimized design plans, scientifically coordinated construction efforts, and strictly controlled quality to ensure the projects were completed on time and to a high standard [2].
【省媒看金昌】国内首条羰基尾料规模化处理生产线在金川铜贵建成投产
Sou Hu Cai Jing· 2026-01-08 11:26
Core Insights - Jinchuan Group's carbonyl tailings platinum group metals efficient separation and extraction technology industrialization project has officially commenced production, marking a significant breakthrough in the efficient recycling of precious metal resources and green low-carbon development [1][3]. Group 1: Project Overview - The carbonyl tailings processing production line is the first in China to achieve large-scale processing of similar materials, indicating Jinchuan Group's advancements in strategic resource autonomy [1][3]. - The total investment for the platinum group metals efficient separation and extraction project is 127 million yuan, with construction starting in September 2024 and completion expected by December 28, 2025 [3]. - The project successfully addresses the technical challenges of efficiently separating and extracting scarce platinum group metals such as platinum, palladium, rhodium, ruthenium, and iridium from complex carbonyl tailings [3]. Group 2: Environmental Initiatives - The concurrently completed precious metals flue gas centralized treatment project is a key technological transformation project for Jinchuan Group in 2025, with an investment of 49.96 million yuan, starting construction in April 2025 [3]. - This project focuses on centralized and in-depth treatment of flue gas emissions from precious metal production systems, reinforcing the company's commitment to environmental protection and ecological civilization [3]. Group 3: Construction Challenges - During the project construction, the team faced challenges related to the integration of technologies across metallurgy, construction, chemical, and electromechanical installation sectors, as well as tight schedules and complex site operations [5]. - The construction team optimized design plans, scientifically coordinated construction, and strictly controlled quality to ensure the project was completed on time and to a high standard [5].