Workflow
耙吸式挖泥船
icon
Search documents
海南适度超前建设基础设施 持续提高基础设施网络化智能化水平
Hai Nan Ri Bao· 2025-12-18 03:56
更高!全国首个商业航天发射场进入常态化发射阶段,"向天图强"逐梦苍穹,具有全球影响力的商业航天 新高地正加快崛起。 海南适度超前建设基础设施,持续提高基础设施网络化智能化水平—— 互联互通强连接 更强!持续提升经济外向度,外贸实力硬核增强,全省贸易进出口总额从2020年的933.3亿元提升到2024 年的2778.9亿元,连续跨越2个千亿元大关,货物贸易、服务贸易年均增长31.3%和32.3%。 基础设施是自由贸易港建设的重要支撑。基建为"桥",人员在你来我往中合作提速,贸易在互通有无中 升温,产业在国际交流协作中攀升新高峰。 ② 环岛旅游公路儋州火山海岸段,风车与道路相映成趣。 海南日报全媒体记者 张茂 摄 海南日报全媒体记者 曹马志 ① 5G网络基站。 (资料图) 更快!海南自贸港机场群加密全球航线,境内外旅客吞吐量今年将首次突破5000万人次,创历史新纪录。 当前,海南正加快实施一批重大基础设施工程,持续提高基础设施网络化智能化水平,加密海南直达全 球主要客源地的国际航线,加快构建高质量现代基础设施体系,提升世界通达度和能见度,不断拓展自由贸 易港国际"朋友圈"。 A 新通道 升级通达水平 今年旅客吞吐 ...
视频丨荆江二期整治工程即将完工 航道“肠梗阻”进一步打通
Core Viewpoint - The Yangtze River, as China's largest river and a vital inland shipping route, is undergoing significant improvements to enhance its navigational capacity, particularly in the Jingjiang section, with the second phase of the channel renovation set to commence by the end of 2024 and complete by the end of this year [1][16]. Group 1: Project Overview - The Jingjiang section's renovation aims to maintain a stable water depth of 4.5 meters even during low water periods, allowing 5,000-ton vessels to navigate year-round from the Yangtze River estuary to Chongqing [10][23]. - The project includes both dredging to remove sediment and protective measures to prevent erosion, ensuring the channel remains navigable and safe [12][24]. Group 2: Dredging Techniques - The dredging process utilizes a "dredging ship" equipped with large iron rakes to stir up sediment, which is then sucked into the ship's hold, functioning as a mobile "riverbed vacuum" [4][6]. - The dredging is crucial due to the river's winding nature, where sediment can accumulate, especially during low water periods, creating obstacles for navigation [8][10]. Group 3: Erosion Control Measures - Erosion control involves placing protective layers made of woven fabric and concrete blocks along vulnerable riverbanks, effectively acting as a "blanket" to prevent soil erosion [12][14]. - The project also incorporates eco-friendly structures to protect rare fish species, ensuring that construction activities do not disrupt local ecosystems [16][30]. Group 4: Ecological Considerations - The renovation project is designed to enhance biodiversity by creating habitats for aquatic life, such as artificial reefs, while maintaining the navigational integrity of the river [16][30]. - The use of innovative ecological bank protection structures, including tiered designs, helps dissipate wave energy and supports plant growth, contributing to a greener riverbank [28][30].