Workflow
钢护筒
icon
Search documents
三峡翻坝码头首根“巨无霸”钢护筒精准安装
Zhong Guo Xin Wen Wang· 2026-01-06 05:35
Group 1 - The installation of the first "giant" steel protective tube for the Three Gorges Dam's oil transshipment project marks a significant breakthrough in the project's key milestones, laying a solid foundation for subsequent construction [1] - The Three Gorges Dam's upper terminal consists of five 5,000-ton oil berths, a pipeline corridor, and related facilities, with the steel protective tube being crucial for the project's stability [1] - The installed steel protective tube measures 61.5 meters in length, equivalent to the height of a 20-story building, with a diameter of 2.6 meters and a total weight of 102 tons, presenting high technical difficulty and construction risks [1] Group 2 - The Three Gorges Hub's oil transshipment project is located in Hubei Province, Yichang City, and includes multiple components such as upper and lower terminals and long-distance pipelines, designed to transport 5.8 million tons of gasoline, diesel, and aviation kerosene annually [2] - Upon completion, the project will establish a "three-dimensional energy corridor" integrating rail-water transport and pipeline networks [2]
2120mm螺旋管 加工钢护筒 锁扣螺旋钢管厂家 压力螺旋钢管 韶关 深圳 梧州 阳江 云浮 湛江厚壁螺旋钢管
Sou Hu Cai Jing· 2025-10-31 16:36
Group 1 - The steel market has shown a three-day upward trend as the traditional peak season approaches, driven by macroeconomic factors and positive sentiment [1] - The Federal Reserve's recent decision to lower the federal funds rate by 25 basis points to a target range of 3.75% to 4% has boosted market confidence and liquidity [2] - The rebound in steel prices is supported by cost-driven factors and market emotions, but there are concerns about potential limitations on upward movement if inventory reduction slows or policy implementation falls short of expectations [1]