Workflow
Photovoltaic Power
icon
Search documents
海南新能源装机比例升至47.8%
Zhong Guo Xin Wen Wang· 2025-08-12 01:37
2025年以来,海南新能源新增并网容量371万千瓦,装机突破1200万千瓦,同时有力推进"新能源+储 能"模式,完成配储容量124.7万千瓦。 资讯编辑:陈群 021-26096771 资讯监督:乐卫扬 021-26093827 资讯投诉:陈跃进 021-26093100 据南方电网海南电网公司8月11日发布的消息,截至8月8日,海南省新能源装机达到1208万千瓦,占全 省总装机比例升至47.8%,能源转型走在全国前列。 作为"风、光"资源得天独厚的热带岛屿,海南近年来大力推进"清洁能源岛"建设。目前,海南省装机的 新能源中,风电217万千瓦,光伏945万千瓦,生物质46万千瓦。 ...
全国首个新能源机制电价竞价细则发布
Core Viewpoint - The article discusses the implementation details of the new pricing mechanism for renewable energy projects in Shandong Province, focusing on the competitive bidding process for wind and solar power projects set to be operational between June 1 and December 31, 2025 [2][9]. Bidding Parameters - The total scale of the mechanism electricity is set at 9.467 billion kWh, with wind power accounting for 8.173 billion kWh and solar power for 1.294 billion kWh [3]. - The minimum bidding submission rate for both wind and solar projects is established at 125% [4]. - The mechanism electricity ratio is set at 70% for wind projects and 80% for solar projects [5]. - The bidding price limits are defined, with a maximum of 0.35 yuan per kWh for both wind and solar, and a minimum of 0.094 yuan for wind and 0.123 yuan for solar [5]. Execution Period - The execution period for deep-sea wind power is set at 15 years, while other projects will have a 10-year period [6]. Calculation of Mechanism Electricity - Specific formulas for calculating mechanism electricity for various types of projects are provided, including land-based wind, offshore wind, and both centralized and distributed solar power [6][7]. Bidding Subject - The bidding participants must be projects that have been completed and those expected to be operational by December 31 of the following year, which have not previously been included in the mechanism pricing [8][15]. Bidding Organization - The bidding will be organized separately for different technology types, such as solar and deep-sea wind, unless there is a lack of effective competition [8][24]. Bidding Volume - The annual new electricity volume included in the mechanism will be determined based on the completion of renewable energy consumption responsibilities and user affordability [23]. Bidding Process - The bidding process is scheduled to be organized annually in October, with the first bidding taking place in August 2025 [31]. Guarantee Mechanism - Requirements for performance guarantees are specified for both operational and non-operational projects, with specific amounts calculated based on project capacity and bidding parameters [35][36]. Conclusion - The implementation details aim to promote high-quality development of renewable energy in Shandong Province, ensuring a structured and competitive bidding process for future projects [9][39].
宁夏“136号文”:存量0.2595元/kWh,增量0.18-0.2595元/kWh
Core Viewpoint - The article discusses the implementation plan for the market-oriented reform of renewable energy grid prices in Ningxia, aiming to enhance the role of the market in resource allocation and promote high-quality development of renewable energy [3]. Group 1: Market Formation of Renewable Energy Grid Prices - Renewable energy generation (wind and solar) will primarily participate in market trading, with grid prices determined through market transactions [4]. - A price cap of 0.56 yuan/kWh and a floor of 0 yuan/kWh will be established for the Ningxia electricity spot market, with adjustments based on market operations [4]. - Encouragement for distributed renewable energy projects to participate directly or through aggregation in market trading [4]. Group 2: Support Mechanisms for High-Quality Development - A sustainable price settlement mechanism will be established, where the difference between the market transaction average price and the mechanism price will be shared among all industrial and commercial users [5]. - For existing renewable energy projects (operational before June 1, 2025), 10% of the grid electricity from centralized solar and wind projects will be included in the mechanism, with a mechanism price set at 0.2595 yuan/kWh [6]. - New renewable energy projects starting from June 1, 2025, will have their mechanism electricity scale and price determined based on market conditions, with a bidding price range set between 0.18 yuan/kWh and 0.2595 yuan/kWh [7]. Group 3: Collaborative Reform Mechanisms - The plan emphasizes policy coordination to align with the regional renewable energy development goals, enhancing the consumption level of renewable energy [9]. - Strengthening organizational collaboration among relevant departments to ensure effective implementation of the reform measures [10]. - Continuous monitoring and evaluation of market price fluctuations, renewable energy generation costs, and user electricity prices will be conducted to assess the impact of the reforms [10]. Implementation Timeline - The proposed plan will take effect on October 1, 2025, subject to adjustments based on national policy changes [11].
2025年一季度光伏发电建设情况
国家能源局· 2025-04-29 08:31
2025年一季度光伏发电建设情况 | 省(区、市) | | 2025年一李度新增并网容量 | | | | 截至2025年3月底累计并网容量 | | | | --- | --- | --- | --- | --- | --- | --- | --- | --- | | | | 其中: | | 其中:分布式光伏 | | 其中: | 其中:分布式光伏 | | | | | 集中式 | | | | 集中式 | | | | | | 光伏电 | | 其中: | | 光伏电 | | 其中: | | | | 站 | | 户用 | | 站 | | 户用 | | | | | | 光伏 | | | | 光伏 | | 总计 | 5971 | 2341 | 3631 | ૨૦૨ | 94544 | 53440 | 41104 | 15032 | | 北京 | 18.1 | 0.0 | 18.1 | 6.3 | 148.8 | 8.1 | 140.7 | 47.4 | | 天津 | 66.3 | 29.4 | 36.9 | 0.4 | 790.4 | 380.7 | 409.8 | 47.9 | | 河北 | 219.3 | 118.2 ...
山东能源新能源集团揭牌 剑指上市
Qi Lu Wan Bao· 2025-04-27 06:51
Group 1 - Shandong Energy Group New Energy Group Co., Ltd. was officially launched on April 25, marking a significant step in the development of the new energy power industry for Shandong Energy Group [1] - The company has a registered capital of 981 million yuan and is responsible for power supply assurance, planning, technical guidance, and external coordination within the energy sector [1] - The total installed capacity of the company is 20.71 million kilowatts, with total assets amounting to 56.947 billion yuan, making it the largest power enterprise under Shandong Province [1] Group 2 - The company aims to become a publicly listed entity and is focusing on integrated coal and electricity operations, as well as the development of clean energy sources [2] - Strategic layouts include four major bases for offshore wind power, integrated wind-solar-storage, photovoltaic power in subsided mining areas, and renewable energy bases for external power supply [2] - The shareholders of the new energy group are Shandong Energy Group Co., Ltd. (93.8838%) and Yanzhou Coal Mining Group (6.1162%) [4]