CHINA LONGYUAN(00916)
Search documents
龙源电力(00916) - 2023 - 中期财报

2023-09-15 08:49
Financial Performance - The company reported consolidated operating revenue of RMB 19.847 billion for the six months ended June 30, 2023, a decrease of 8.4% compared to RMB 21.662 billion for the same period in 2022[2]. - The pre-tax profit increased by 10.9% to RMB 6.999 billion, up from RMB 6.309 billion in the previous year[14]. - Net profit attributable to equity holders of the company rose by 18.3% to RMB 5.124 billion, compared to RMB 4.332 billion in the same period last year[14]. - Basic earnings per share increased to RMB 0.5997, up from RMB 0.5052 in the previous year, reflecting a growth of 18.6%[14]. - The total comprehensive income for the period was RMB 5.838 billion, compared to RMB 5.240 billion in the same period last year[14]. - In the first half of 2023, the company achieved a net profit of RMB 5.834 billion, an increase of 13.5% compared to RMB 5.140 billion in the same period of 2022[83]. - The profit attributable to equity holders of the company reached RMB 51.24 billion, up 18.3% from RMB 43.32 billion in the first half of 2022[136]. Revenue Segments - The wind power segment's sales revenue in the first half of 2023 was RMB 15.215 billion, up 6.4% from RMB 14.294 billion in the same period of 2022[84]. - The coal sales revenue from the thermal power segment in the first half of 2023 was RMB 1.507 billion, a significant decrease of 64.4% from RMB 4.237 billion in the same period of 2022[88]. - The photovoltaic power generation segment's sales revenue increased by 47.4% to RMB 460 million in the first half of 2023, compared to RMB 312 million in the same period of 2022[88]. - The wind power segment's revenue for the first half of 2023 was RMB 152.15 billion, a growth of 6.4% from RMB 143.06 billion in the same period of 2022[140]. - The thermal power segment's revenue decreased by 40.9% to RMB 41.03 billion, down from RMB 69.47 billion in the same period of 2022[148]. - The photovoltaic segment's revenue surged by 47.8% to RMB 4.61 billion, compared to RMB 3.12 billion in the first half of 2022[156]. Capacity and Generation - The total installed capacity of power generation in the country reached 2.71 billion kilowatts, a year-on-year increase of 10.8%[22]. - Non-fossil energy generation capacity grew by 18.6% to 1.39 billion kilowatts, accounting for 51.5% of the total installed capacity, an increase of 3.4 percentage points year-on-year[22]. - Wind power generation capacity increased by 13.7% to 390 million kilowatts, while solar power capacity surged by 39.8% to 470 million kilowatts[22]. - The total electricity generation for the first half of 2023 reached 39,746,820 MWh, representing a year-on-year increase of 9.48%, with wind power generation increasing by 9.57% to 33,108,421 MWh[35]. - The company launched 36 new projects in the first half of 2023, with a total installed capacity of 515.41 MW, including 125.20 MW from wind and 390.21 MW from solar[52]. - The installed capacity of the company as of June 30, 2023, was 31,623.25 MW, with wind power accounting for 26,317.04 MW and solar power for 3,431.21 MW[52]. Costs and Expenses - Operating expenses for the first half of 2023 were RMB 11.896 billion, a decrease of 15.5% from RMB 14.079 billion in the same period of 2022[93]. - The company's depreciation and amortization expenses were RMB 5.285 billion, an increase of 6.4% compared to RMB 4.967 billion in the same period of 2022[96]. - Employee costs rose to RMB 2.182 billion in the first half of 2023, an increase of 18.1% from RMB 1.847 billion in the first half of 2022[106]. - Material costs decreased to RMB 0.058 billion in the first half of 2023, down 43.1% from RMB 0.102 billion in the first half of 2022[108]. - Maintenance costs were RMB 0.313 billion in the first half of 2023, a decrease of 11.6% from RMB 0.354 billion in the first half of 2022[112]. - Administrative expenses slightly increased to RMB 0.332 billion in the first half of 2023, up 0.3% from RMB 0.331 billion in the first half of 2022[116]. Assets and Liabilities - Total assets as of June 30, 2023, amounted to RMB 2,333.40 billion, an increase of RMB 101.18 billion from RMB 2,232.22 billion at the end of 2022[170]. - Total liabilities increased to RMB 1,491.72 billion, up RMB 56.95 billion from RMB 1,434.77 billion at the end of 2022[170]. - The equity attributable to equity holders of the company rose to RMB 723.97 billion, an increase of RMB 39.48 billion from RMB 684.49 billion at the end of 2022[170]. - The company's current assets amounted to RMB 569.27 billion, an increase of RMB 40.62 billion from RMB 528.65 billion as of December 31, 2022[178]. - The company's current liabilities decreased to RMB 713.89 billion as of June 30, 2023, from RMB 740.27 billion as of December 31, 2022[182]. - The net current liabilities decreased to RMB 144.62 billion as of June 30, 2023, from RMB 211.62 billion as of December 31, 2022[182]. Strategic Initiatives - The company is committed to enhancing safety management and has implemented a "100-day attack" action plan to improve production safety, resulting in a 23.80% increase in the number of long-running units compared to the previous year[37]. - The company is focused on digital transformation and innovation as part of its strategy to become a world-class renewable energy company[35]. - The company is actively participating in carbon market construction, issuing approximately 1.72 million green certificates to achieve 100% green electricity usage for its headquarters and training base[70]. - The company is focusing on the development of emerging technologies such as energy storage, hydrogen, and ammonia energy[50]. - The company is advancing the integration of floating wind and fishery projects, with the foundational structure ready for installation[62]. - The company is focusing on strategic planning for international cooperation, with ongoing projects in South Africa, Brunei, and Singapore[68]. Financing and Investments - The company issued 11 short-term financing bonds in the first half of 2023, successfully raising over RMB 30 billion in low-cost bank loans[65]. - The company's capital expenditures for the first half of 2023 were RMB 92.86 billion, a 40.6% increase from RMB 66.04 billion in the same period of 2022[195]. - The company's capital expenditures for wind power projects were RMB 36.72 billion, while expenditures for other renewable energy projects were RMB 53.82 billion[196]. - The company did not have any significant investments in the first half of 2023[200].
龙源电力:龙源电力集团股份有限公司关于公司2023年第十三期超短期融资券发行的公告

2023-09-13 10:38
证券代码:001289 证券简称:龙源电力 公告编号:2023-059 龙源电力集团股份有限公司 本公司及董事会全体成员保证信息披露内容真实、准确和完整,没有虚假记载、误导 性陈述或者重大遗漏。 龙源电力集团股份有限公司(以下简称"公司")于 2023 年 6 月 15 日召开 的 2022 年度股东大会审议通过了《关于龙源电力集团股份有限公司在境内申请 注册及发行债务融资工具一般性授权的议案》,批准并同意授权董事会决定及处 理公司以统一注册或分品种注册的形式在中国银行间市场交易商协会注册、发行 不超过人民币 800 亿元(含 800 亿元)的债务融资工具的相关事宜,类型包括但 不限于超短期融资券、短期融资券、中期票据(含中长期含权票据)、永续票据、 定向债务融资工具、资产支持票据、项目收益票据、权益出资型票据等在内的债 务融资工具;同意董事会转授权公司经理层处理上述相关事宜。 公司已于 2023 年 9 月 12 日发行 2023 年度第十三期超短期融资券,所募集 资金将主要用于偿还公司本部及子公司有息债务及补充营运资金等。相关发行情 况如下: | 超短期融资券全称 | 龙源电力集团股份有限公司 2023 ...
龙源电力:H股-二零二三年第三次临时股东大会通告

2023-09-11 08:56
香港交易及結算所有限公司及香港聯合交易所有限公司對本通告的內 容 概 不 負 責,對 其 準 確 性 或 完 整 性 亦 不 發 表 任 何 聲 明,並 明 確 表 示,概 不對因本通告全部或任何部份內容而產生或因倚賴該等內容而引致的 任 何 損 失 承 擔 任 何 責 任。 中 國 北 京,二 零 二 三 年 九 月 十 二 日 於 本 通 告 日 期,本 公 司 的 執 行 董 事 為 唐 堅 先 生 和 宮 宇 飛 先 生;非 執 行 董 事 為 田 紹 林 先 生、唐 超 雄 先 生、王 一 國 先 生 及 馬 冰 岩 先 生;及 獨 立 非 執 行 董 事 為 魏 明 德 先 生、高 德 步 先 生 和 趙 峰 女 士。 * 僅供識別 二零二三年第三次臨時股東大會通告 茲通告 龍 源 電 力 集 團 股 份 有 限 公 司(「本公司」)謹 訂 於 二 零 二 三 年 九 月 二 十 七 日(星 期 三)上午九時 三十分 於 中 華 人 民 共 和 國 北 京 市 西 城 區 阜 成 門北大街6號(c幢)3層會議室召開本公司二零二三年第三次臨時股東大 會(「臨時股東大會」),以 審 議 及 批 准 下 ...
龙源电力:H股-二零二三年第一次H类别股东大会通告

2023-09-11 08:56
香港交易及結算所有限公司及香港聯合交易所有限公司對本通告的內 容 概 不 負 責,對 其 準 確 性 或 完 整 性 亦 不 發 表 任 何 聲 明,並 明 確 表 示,概 不對因本通告全部或任何部份內容而產生或因倚賴該等內容而引致的 任 何 損 失 承 擔 任 何 責 任。 唐 堅 二零二三年第一次H股類別股東大會通告 茲通告 龍 源 電 力 集 團 股 份 有 限 公 司(「本公司」)謹 訂 於 二零二三年 九 月 二 十 七 日(星 期 三)緊 隨 二 零 二 三 年 第 一 次A股類別股東大會結束後於中 華人民共和國北京市西城區阜成門北大街6號(c幢)3層會議室召開本公 司二零二三年第一次H股 類 別 股 東 大 會(「H股類別股東大會」),以 處 理 下 列 事 宜: 特別決議案 1. 審議及批准建議授予董事會回購H股的一般性授權 承董事會命 龍源電力集團股份有限公司 – 2 – 1. 為確定有權出席H股 類 別 股 東 大 會 並 於 會 上 投 票 的 股 東 名 單,本 公 司 將 於 二 零 二 三 年 九 月 二 十 二 日(星 期 五)至 二 零 二 三 年 九 月 二 十 七 日(星 ...
龙源电力:H股-建议授予董事会回购H股的一般性授权、二零二三年第三次临时股东大会及二零二三年第一次H股类别股东大会通函

2023-09-11 08:56
此乃要件 請即處理 閣下如對本通函任何內容或應採取的行動有任何疑問,應諮詢 閣下的股票經紀或其他註冊證券 商、銀行經理、律師、專業會計師或其他專業顧問。 閣下如已售出或轉讓名下的龍源電力集團股份有限公司全部股份,應立即將本通函連同隨附之委 任代表表格送交買主或承讓人,或送交經手買賣或轉讓的銀行、股票經紀或其他代理商,以便轉 交買主或承讓人。 香港交易及結算所有限公司及香港聯合交易所有限公司對本通函的內容概不負責,對其準確性或 完整性亦不發表任何聲明,並明確表示,概不對因本通函全部或任何部份內容而產生或因倚賴該 等內容而引致的任何損失承擔任何責任。 建議授予董事會回購H股的一般性授權 二零二三年第三次臨時股東大會通告 及 二零二三年第一次H股類別股東大會通告 本公司謹訂於二零二三年九月二十七日(星期三)上午九時三十分於中華人民共和國北京市西城區 阜成門北大街6號(c幢)3層會議室召開二零二三年第三次臨時股東大會(「臨時股東大會」)、二零 二三年第一次A股類別股東大會及二零二三年第一次H股類別股東大會(「H股類別股東大會」),臨 時股東大會及H股類別股東大會通告載於本通函第10至13頁。 如 閣下欲委託代理人出席 ...
龙源电力:龙源电力集团股份有限公司2023年8月发电量数据公告

2023-09-11 08:56
业务板块及地区分布 2023 年 8 月 发电量 (兆瓦时) 2022 年 8 月 发电量 (兆瓦时) 8 月同比 变化率 (%) 2023 年 累计发电量 (兆瓦时) 2022 年同期 累计发电量 (兆瓦时) 年累计 发电量 同比变化 率 (%) 风电业务 3,151,578 3,842,434 -17.98 41,043,874 37,807,080 8.56 其中:黑龙江 162,318 213,751 -24.06 2,019,405 1,978,669 2.06 吉林 90,637 120,321 -24.67 1,319,514 1,280,656 3.03 辽宁 162,186 181,872 -10.82 2,410,050 1,960,819 22.91 内蒙古 297,295 385,365 -22.85 4,706,788 4,288,199 9.76 江苏陆上 115,193 135,382 -14.91 1,641,115 1,537,458 6.74 江苏海上 279,399 326,890 -14.53 3,680,011 3,506,452 4.95 浙江 22,088 25, ...
龙源电力:H股-二零二三年第一次H股类别股东大会委任代表表格

2023-09-11 08:56
二零二三年第一次H股類別股東大會 委任代表表格 與本委任代表表格有關的H股股份數目 (附註1) 本人╱吾等 (附註2) ,地址為 | | 特別決議案 | 贊成 | (附註5) | 反對 | (附註5) | 棄權 | (附註5) | | --- | --- | --- | --- | --- | --- | --- | --- | | 1. | 審議及批准建議授予董事會回購H股的一般性授權 | | | | | | | 日期:二零二三年 月 日 簽署 (附註6) : 注意: 請 閣下委派代表前,首先審閱本公司日期為二零二三年九月十二日之二零二三年第三次臨時股東大會及二零二三年第一次H 股類別股東大會通函。 附註: * 僅供識別 , , 為龍源電力集團股份有限公司(「本公司」) 股H股 (附註3) 的持有人,現委任大會 主席,或 (附註 4 ) ,地址為 為本人╱吾等的代理人出席二零二三年九月二十七日(星期三)緊隨二零二三年第一次A股類別股東大會結束後,於中華人民共和國(「中 國」)北京市西城區阜成門北大街6號(c幢)3層會議室舉行的本公司二零二三年第一次H股類別股東大會(「H股類別股東大會」)或其任何延 期召開的 ...
龙源电力:龙源电力集团股份有限公司关于召开2023年第3次临时股东大会和2023年第1次A股类别股东大会的通知

2023-09-11 08:56
本次股东大会采用的网络投票系统:深圳证券交易所交易系统 证券代码:001289 证券简称:龙源电力 公告编号:2023-057 龙源电力集团股份有限公司 关于召开 2023 年第 3 次临时股东大会和 2023 年第 1 次 A 股类别股东大会的通知 本公司及董事会全体成员保证信息披露内容真实、准确和完整,没有虚假记载、误导 性陈述或者重大遗漏。 重要内容提示 股东大会召开日期:2023 年 9 月 27 日 根据龙源电力集团股份有限公司(以下简称"公司"或"本公司")于 2023 年 9 月 6 日召开的第五届董事会 2023 年第 7 次会议决议,公司定于 2023 年 9 月 27 日召开 2023 年第 3 次临时股东大会和 2023 年第 1 次 A 股类别股东大会。现将 有关事项通知如下。 一、会议召开情况 1.股东大会届次:2023 年第 3 次临时股东大会、2023 年第 1 次 A 股类别股 东大会 2.股东大会的召集人:公司董事会 3.会议召开的合法、合规性: 本次会议的召开符合有关法律、行政法规、部门规章、规范性文件和《公司 章程》的有关规定。 4.会议召开时间: 现场会议召开时间:20 ...
龙源电力:H股-二零二三年第三次临时股东大会委任代表表格(H股股东适用)

2023-09-11 08:56
二零二三年第三次臨時股東大會委任代表表格 (H股股東適用) 注意: 請 閣下委派代表前,首先審閱本公司日期為二零二三年九月十二日之二零二三年第三次臨時股東大會及二零二三年第一次H 股類別股東大會通函。 附註: 與本委任代表表格有關之股份數目(H股) (附註1) 日期: 年 月 日 簽署 (附註6) : 本人╱吾等 (附註2) ,地址為 , 為龍源電力集團股份有限公司(「本公司」) 股H股 (附註3) 的持有人, 現委任大會主席,或 (附註4) ,地址為 ,為本人╱吾等的代理人出席二零二三年九月二十七日(星期三)上午九時三十分於中華人民共和國(「中國」)北京市西城區 阜成門北大街6號(c幢)3層會議室舉行的本公司二零二三年第三次臨時股東大會(「臨時股東大會」)或其任何延期召開的會 議,並於該會或其任何延期召開的會議上代表本人╱吾等,依照下列指示就臨時股東大會通告所列載之決議案投票。如 無作出指示,則由本人╱吾等的代理人酌情決定投票。 | | | 1. 請填上以 閣下名稱登記與本委任代表表格有關的H股股份數目。如填上數目,則委任代表表格將被視為僅與該等股份有關。 如未有填上數目,則委任代表表格將被視為與以 閣下名 ...
龙源电力:H股-就二零二三年第三次临时股东大会及二零二三年第一次H股类别股东大会暂停办理H股股份过户登记手续

2023-09-07 11:22
公 告 就二零二三年第 三 次臨時股東大會 及二零二三年第一次H股類別股東大會 暫停辦理H股股份過戶登記手續 龍 源 電 力 集 團 股 份 有 限 公 司(「本公司」)謹 此 宣 佈,為 確 定 有 權 出 席 將 於 二 零 二 三 年 九 月 二 十 七 日(星 期 三)舉 行 的 二 零 二 三 年 第 三 次臨時股東 大 會(「臨時股東大會」)及 二 零 二 三 年 第 一 次H股 類 別 股 東 大 會(「H股 類 別股東大會」)並 於 會 上 投 票 的H股 股 東 名 單,本 公 司 將 於 二 零 二 三 年 九 月 二 十 二 日(星 期 五)至 二 零 二 三 年 九 月 二 十 七 日(星 期 三)(首 尾 兩 天 包 括 在 內)期 間 暫 停 辦 理H股 股 份 過 戶 登 記 手 續,期 間 不 接 受 任 何 本 公 司H 股 股 份 過 戶 登 記。為 符 合 資 格 出 席 臨 時 股 東 大 會 及H股類別股東大會並 於 會 上 投 票,所 有H股股份過戶文件連同有關股票須於二零二三年九月 二 十 一 日(星 期 四)下 午 四 時 三 十 分 之 前 送 交 本 公 司 ...