CH ENERGY ENG(03996)
Search documents
中国能建安徽电建二公司承建的安徽医科大学新医科中心项目移交投用
Zhong Guo Jin Rong Xin Xi Wang· 2025-09-15 12:37
Core Insights - The new campus of Anhui Medical University, with a total investment of approximately 6.7 billion yuan, officially opened with nearly 15,000 faculty and students moving in, marking a significant expansion in both space and development philosophy [1][9] - The campus aims to become a national-level medical innovation hub, integrating "smart and green" concepts into its design and operations [1][6] Infrastructure and Facilities - The new campus covers over 2,000 acres with a total construction area of 970,000 square meters, featuring three core teaching buildings named "Zhiyuan," "Tanwei," and "Xunzhen," which symbolize the academic journey from knowledge acquisition to truth exploration [2][3] - The campus includes a comprehensive research building that houses six major departments, promoting interdisciplinary collaboration and the cultivation of compound talents in the "new medical" field [3][4] Technological Integration - The East District's "Tanwei Building" connects with the high-level public health college, enhancing interdisciplinary cooperation and resource sharing [4] - The campus is equipped with 162 smart classrooms and a library with nearly 10,000 volumes, designed to foster an engaging learning environment [6] Sustainability Initiatives - The campus emphasizes sustainability, featuring extensive photovoltaic panels on rooftops to provide clean energy and a "sponge city" system for rainwater collection and purification [8][9] - The landscaping includes a variety of trees and plants, contributing to a rich ecological environment that also serves to regulate the microclimate [8] Project Management and Recognition - The project, led by China Energy Construction Anhui Electric Power Construction Company, has been recognized as a model for high-quality public welfare projects in Anhui Province, integrating advanced management techniques such as AI and BIM for lifecycle management [9][11] - The project has received multiple accolades for safety and innovation, showcasing the company's commitment to quality and excellence in construction [9][11]
中国能建东电二公司:“职业赋能” 助力新员工迈好职场第一步
Huan Qiu Wang· 2025-09-15 05:53
"刚到公司时,我既期待又忐忑,不知道该如何快速适应职场生活。但这场迎新主题座谈会,让我心里 的石头落了地。" 新员工小李在参加完座谈会后,脸上露出了轻松的笑容。为帮助新员工缓解初入职场 的陌生感与焦虑感,东电二公司第一时间组织开展迎新主题座谈会。会上,老员工与新员工围坐在一 起,像朋友般畅聊起来。老员工们结合自身经历,分享了职业发展过程中的宝贵经验,也毫无保留地传 授了环境适应、人际关系处理等方面的实用技巧;新员工们则积极提问,将心中的困惑与迷茫一一倾 诉。现场氛围热烈而温馨,一阵阵欢声笑语拉近了彼此的距离。 "我们深知,新员工能否快速融入团队,是他们实现角色转换的关键。因此,公司特别安排业务骨干与 新员工'结对子',建立'一对一'帮扶机制。" 各工程公司项目负责人在座谈会上明确表示。这些业务骨 干不仅会在工作中为新员工提供指导,帮助他们熟悉工作流程、掌握工作方法,还会在生活中关心他们 的需求,为他们解决住宿、饮食等方面的问题。通过这种 "一对一" 的帮扶,新员工们感受到了公司的 温暖与关怀,也更快地找到了归属感,逐步融入东电二公司这个大家庭。 知识赋能:"理论 + 实践",夯实专业根基 来源:环球网 八月流 ...
中国能建葛洲坝二公司孟底沟水电站项目:推动精细化管理落地见效
Huan Qiu Wang· 2025-09-15 02:28
Group 1 - The project management team of China Energy Construction Gezhouba Group's Mengdigou project focuses on resource allocation and optimizing construction processes to ensure project implementation and achieve annual goals [1] - The team emphasizes cost control and enhancing operational efficiency, adhering to the principle of "profit is honor, loss is shame" [1] - As of now, 90% of site traffic has been completed, and 90% of the right bank's dangerous rock slope treatment has been finished [1] Group 2 - The project management team has improved the quality management system, enhancing daily quality supervision and training, which has significantly reduced quality issues on-site [2] - The team has successfully created demonstration processes and model warehouses in the Mengdigou construction area, setting a benchmark for similar projects [2] Group 3 - The project department's party branch has deepened grassroots party building efforts, optimizing organizational mechanisms and promoting the integration of party work with production management [3] - The project has actively engaged in community activities, addressing 12 urgent issues for workers and fostering a vibrant work environment through various cultural events [3]
中国能建葛洲坝二公司承建的世界最大抽水蓄能电站全面投产发电
Huan Qiu Wang· 2025-09-15 02:14
Core Viewpoint - The Hebei Fengning Pumped Storage Power Station, the world's largest in terms of installed capacity, has officially commenced commercial operation, contributing to energy security with green power [1][3]. Group 1: Project Overview - The Fengning Pumped Storage Power Station is located in Fengning Manchu Autonomous County, Chengde City, Hebei Province, with a total installed capacity of 3.6 million kilowatts [3]. - The annual designed power generation capacity is 66.12 billion kilowatt-hours, while the annual water pumping capacity is 87.16 billion kilowatt-hours [3]. - The project holds the world record for total installed capacity, energy storage capacity, underground plant chamber scale, and single underground plant scale, earning it the nickname "the world's largest power bank" [3]. Group 2: Construction and Technology - China Energy Construction Gezhouba Group Co., Ltd. is responsible for key construction tasks including the upper and lower reservoirs, water inlet and outlet, gate wells, and dam [3]. - The project management team has implemented advanced technologies such as digital dam management, rapid quality testing for roller compacted concrete, intelligent digital grouting, and slipform construction techniques [3]. Group 3: Energy Integration and Environmental Impact - The Fengning Pumped Storage Power Station is the first to connect to a 500 kV flexible DC grid, achieving multi-energy complementarity and enhancing the ability to absorb and deliver renewable energy [3]. - Since the first batch of units was put into operation in December 2021, the station has generated a total of 86.16 billion kilowatt-hours and absorbed 109.02 billion kilowatt-hours of renewable energy and off-peak electricity [3]. - Upon full operation, the station is expected to save 480,800 tons of standard coal annually and reduce carbon dioxide emissions by 1.2 million tons, playing a significant role in optimizing energy structure and reducing carbon emissions [3].
总投资30.5亿!1600万吨/年!中国能建广东肇庆项目预计年底投产
Sou Hu Cai Jing· 2025-09-14 11:00
Group 1 - The construction of the granite mining project in Deqing County, Zhaoqing City, Guangdong Province is nearing completion and is expected to commence operations by the end of this year, becoming a significant high-end sand and gravel aggregate supply base for the Guangdong-Hong Kong-Macao Greater Bay Area [1] - The project represents the largest reserve and highest annual production capacity sand and gravel project in China Energy Construction's history, with a total investment of approximately 3.05 billion yuan and a recoverable resource of nearly 364 million tons, with a production scale of 16 million tons per year [1] - As of now, the industrial square's civil engineering work is nearly complete, with 90% of equipment installation and steel structure factory installation progressing smoothly, while safety facility construction at the mining sites is also advancing [1] Group 2 - Once operational, the project will significantly enhance China Energy Construction's competitiveness and influence in the building materials sector, aiming to provide not only products but also to share green mining construction and management experiences, contributing to the high-quality development of the regional economy [2] - The project is expected to contribute over 80 million yuan in tax revenue annually to Deqing County and directly provide over 300 stable jobs, playing a crucial role in driving local economic development and increasing employment for the community [3]
山高新能源与中国能建第二工程公司及正晨科技订立EPC 合同
Zhi Tong Cai Jing· 2025-09-14 10:45
Group 1 - The core point of the article is the announcement of an EPC contract between Heze Shango Energy and a joint contractor for a wind power project in Shandong Province, China [1] - The total contract value is approximately RMB 1.011 billion, which includes all taxes and may be adjusted based on changes in national tax policies [1] - The project involves a distributed wind power capacity of 175 megawatts located in Yuncheng County, Heze City, Shandong Province [1]
山高新能源(01250)与中国能建第二工程公司及正晨科技订立EPC 合同
智通财经网· 2025-09-14 10:44
Core Viewpoint - Shandong High New Energy and Shandong High Holdings announced the signing of an EPC contract for a 175 MW distributed wind power project in Shandong Province, with a total contract value of approximately RMB 1.011 billion, including all taxes [1] Group 1 - The EPC contract was signed between Heze Shandong High Energy, a wholly-owned subsidiary of Shandong High New Energy, and the joint contractors, China Energy Engineering Second Construction Company and Zhengchen Technology [1] - The project is located in Yuncheng County, Heze City, Shandong Province [1] - The total contract price is subject to adjustment based on changes in national tax policies [1]
中国能建葛洲坝二公司松岗河项目:抓好BIM应用 推进桥梁施工技术创新
Huan Qiu Wang· 2025-09-12 07:42
Core Viewpoint - The project team of China Energy Construction Gezhouba Group Co., Ltd. successfully tackled technical challenges in the construction of the Shajing River pedestrian bridge in Shenzhen through innovative solutions and digital empowerment, ensuring high-quality and efficient project execution [1][3][4]. Group 1: Innovation and Technology Empowerment - The project team established a BIM technology research group to address the challenges posed by the unique geometric design of the bridge, utilizing 3D modeling to identify design conflicts and improve construction accuracy [3]. - Innovative solutions included the use of curved steel structure frameworks and multi-scenario construction simulations, which significantly enhanced the precision of assembling the unique steel box beams, reducing costs and improving safety [3][4]. Group 2: Effective Construction Management - The team implemented a three-dimensional control scheme to prevent tilting of the asymmetric steel arch bridge, enhancing stability through increased temporary support and anchoring systems [4]. - The project achieved key milestones ahead of schedule, completing the steel box beam installation and welding in just three months, and finishing the cofferdam removal 15 days early, thus ensuring safety for the flood season [4][5]. Group 3: Cost Reduction and Efficiency Improvement - The application of BIM technology led to a significant reduction in construction costs by optimizing the construction plan, which shortened the project timeline by 40 days [5]. - The project established a positive cycle of "technical optimization - efficiency improvement - cost control," demonstrating the effectiveness of innovative approaches in construction management [5]. Group 4: Safety Management - The project team utilized BIM technology to create a comprehensive digital model for the construction process, identifying potential risks and implementing targeted safety measures, resulting in zero safety incidents throughout the project [7]. - The successful application of innovative technologies not only ensured the project's smooth progress but also provided valuable references for future construction of spatial curved bridges and unique steel structures [7].
中国能建大宗交易成交198.37万元
Zheng Quan Shi Bao Wang· 2025-09-10 14:39
Group 1 - The core transaction of China Energy Engineering Corporation (中国能建) on September 10 involved a block trade of 830,000 shares at a price of 2.39 yuan, totaling 1.9837 million yuan [2][3] - The buyer was Guotai Junan Securities Co., Ltd., and the seller was China International Capital Corporation [2][3] - Over the past three months, the stock has seen a total of four block trades, with a cumulative transaction amount of 7.7936 million yuan [2] Group 2 - The closing price of China Energy Engineering Corporation on the day of the transaction was 2.39 yuan, with a turnover rate of 0.59% and a total trading volume of 4.57 billion yuan [2] - The stock experienced a net outflow of 13.4402 million yuan in main funds for the day, and a cumulative decline of 0.42% over the past five days [2] - The latest margin financing balance for the stock is 1.402 billion yuan, reflecting a decrease of 25.2005 million yuan, or 1.77%, over the past five days [3] Group 3 - One institutional rating was given for the stock in the past five days, with the highest target price set at 3.07 yuan by CITIC Securities on September 4 [3]
中国能建9月10日现1笔大宗交易 总成交金额198.37万元 溢价率为0.00%
Xin Lang Cai Jing· 2025-09-10 10:54
Group 1 - The closing price of China Energy Engineering Corporation (中国能建) on September 10 was 2.39 yuan, with a significant block trade of 830,000 shares totaling 1.9837 million yuan [1] - The first transaction occurred at a price of 2.39 yuan for 830,000 shares, with a premium rate of 0.00%. The buyer was Guotai Junan Securities Co., Ltd., and the seller was China International Capital Corporation [1] - Over the past three months, the stock has recorded four block trades with a total transaction amount of 7.7936 million yuan. In the last five trading days, the stock has decreased by 0.42%, with a net outflow of 36.3996 million yuan from main funds [1]