Workflow
CH ENERGY ENG(03996)
icon
Search documents
社招!中国能建中电工程国际公司公开招聘公告
Group 1 - China Power Engineering Consulting Group Co., Ltd. (CPECC) was established at the end of 2002 and is a wholly-owned subsidiary of China Energy Engineering Corporation, with a registered capital of 10 billion yuan [1] - CPECC specializes in planning consulting, surveying and design, engineering general contracting, and investment operation, providing high-value services across various infrastructure sectors including energy, environmental protection, smart cities, and transportation [1] - The company has an annual new contract signing amount exceeding 100 billion yuan and annual revenue exceeding 50 billion yuan [1] Group 2 - CPECC's wholly-owned subsidiary, China Power Engineering Consulting Group International Engineering Co., Ltd., is based in Shanghai with a registered capital of 3 billion yuan [1] - This subsidiary serves as an important platform for CPECC's international energy and power engineering business, focusing on thermal power, power grids, renewable energy, and integrated smart energy services [1] - The goal is to become a comprehensive international consulting service provider covering the entire project lifecycle, including investment, planning, design, construction, and operation [1] Group 3 - The company is currently hiring for various positions, including design manager, cost control manager, contract manager, EPC project manager, and financial manager, with opportunities for both domestic and overseas placements [4] - Candidates are required to have a master's degree or above, with specific qualifications and experience in relevant fields, and must be under 45 years of age [4][11] - The recruitment process includes submitting a detailed application form and relevant documentation, with a deadline for applications set for January 31, 2026 [10][11] Group 4 - Employee benefits include social insurance, corporate annuities, supplementary medical insurance, and various allowances such as communication and transportation [6] - Employees without local household registration and housing will receive housing subsidies, and those with spouses living apart will benefit from a monthly family visit policy [6] - Expatriate employees will enjoy additional benefits such as annual leave, overseas allowances, and global accident insurance [7]
中国能建安徽电建二公司中标西双版纳景洪100兆瓦光伏EPC总承包项目
据悉,该项目建成后,预计年均可提供清洁上网电量约1.8亿千瓦时,可有效改善当地环境质量和生态 状况,对推动生态文明建设、促进经济社会发展具有积极作用和重要意义。(何咏梅) 编辑:王姝睿 声明:新华财经(中国金融信息网)为新华社承建的国家金融信息平台。任何情况下,本平台所发布的 信息均不构成投资建议。如有问题,请联系客服:400-6123115 转自:新华财经 近日,中国能建安徽电建二公司成功中标云南西双版纳景洪100兆瓦光伏EPC总承包项目。 该项目位于云南省西双版纳傣族自治州景洪市勐龙镇,规划建设装机容量100兆瓦光伏发电项目。该公 司承担范围包括光伏场区和集电线路的勘察设计、采购与施工,以及升压站扩建项目的勘察设计工作。 ...
中国能建葛洲坝二公司太子河抽水蓄能电站:深山藏“智慧”
Huan Qiu Wang· 2026-01-16 13:41
Core Viewpoint - Pumped storage power stations are crucial for stabilizing modern power systems and ensuring energy security, especially in the context of rapid clean energy development [1][3]. Group 1: Project Overview - The Taizi River pumped storage power station in Benxi, Liaoning, is a key project under China's 14th Five-Year Plan, representing the largest pumped storage facility in Northeast China [1][3]. - The total investment for the Taizi River pumped storage power station is 12.145 billion yuan, with an installed capacity of 1.8 million kilowatts [3]. - Upon operation, the station is expected to generate 36.14 billion kilowatt-hours annually, saving approximately 698,000 tons of standard coal and reducing carbon dioxide emissions by 1.641 million tons [3]. Group 2: Digital Transformation - The construction of the Taizi River pumped storage power station incorporates a modern management system that emphasizes digitalization to enhance safety, quality, and reliability [3][4]. - A digital command and scheduling platform integrates various elements such as BIM models, GIS information, construction progress, material resources, and personnel density into a visual system [6]. - Real-time data management for materials and personnel has improved transparency and efficiency, allowing for better organization and operational flow [8][9]. Group 3: Safety and Quality Management - A comprehensive video monitoring and environmental monitoring system has been established to ensure real-time safety assessments, shifting from reactive to proactive safety management [11]. - Quality management is enhanced through mobile inspections and 3D laser scanning, ensuring that every aspect of the project is documented and verifiable [11]. - The digitalization efforts have created a new governance structure for the project, making it transparent, controllable, and traceable [11][12]. Group 4: Strategic Implications - The digitalization of the Taizi River pumped storage power station project represents a shift towards systematic, transparent, and verifiable infrastructure development [12][14]. - The methodologies and data assets developed during this project can be replicated and applied to future pumped storage and clean energy infrastructure projects, contributing to the industry's overall growth [14].
中国能建:公司运营情况均在定期报告中详细披露
Zheng Quan Ri Bao· 2026-01-09 14:24
Group 1 - The company stated that its business operations are disclosed in detail according to the requirements of the information disclosure rules for listed companies in regular reports [2] - The controlling shareholder determines the share buyback plan based on market conditions, the company's development stage, and funding plans [2] - The company will strictly adhere to disclosure obligations if there are any related plans in the future [2]
中国能建:公司与各领域优秀企业保持广泛合作
Zheng Quan Ri Bao· 2026-01-09 14:24
证券日报网讯 1月9日,中国能建在互动平台回答投资者提问时表示,公司始终秉持开放合作理念,与 各领域优秀企业保持广泛合作,通过优势互补共同推动项目落地实施。 (文章来源:证券日报) ...
中国能建:公司经营数据按照上市公司信息披露规则要求于定期报告中公告
Zheng Quan Ri Bao· 2026-01-09 14:24
证券日报网讯 1月9日,中国能建在互动平台回答投资者提问时表示,公司经营数据按照上市公司信息 披露规则要求于定期报告中公告。 (文章来源:证券日报) ...
中国能建:公司稳步探索多元化工程款支付与盈利方式
Zheng Quan Ri Bao· 2026-01-09 14:22
Core Viewpoint - The company emphasizes the importance of managing overseas business risks and is actively exploring various project implementation models to enhance its competitiveness in the international engineering market [2] Group 1 - The company is focused on the early-stage planning of projects to mitigate risks associated with overseas operations [2] - The company is exploring diversified payment and profit models for engineering projects while ensuring the safety of project receivables [2] - The company aims to comprehensively compare and select the optimal model to continuously enhance its overall competitiveness in the international engineering market [2]
中国能建:公司积极探索并布局绿色电力供应解决方案,助力AI产业可持续发展
(编辑 丛可心) 证券日报网讯 1月9日,中国能建在互动平台回答投资者提问时表示,数据中心电力保障是行业重要课 题,公司依托自身能源全产业链优势,积极探索并布局绿色电力供应解决方案,助力AI产业可持续发 展。 ...
中国能建:中央企业投资应聚焦主业,严控非主业投资
Zheng Quan Ri Bao Wang· 2026-01-09 14:13
证券日报网讯 1月9日,中国能建(601868)在互动平台回答投资者提问时表示,按照《中央企业投资 监督管理办法》等相关规定要求,中央企业投资应当服务国家发展战略,符合企业发展规划,坚持聚焦 主业,大力培育和发展战略性新兴产业,严格控制非主业投资。 ...
中国能建:中国能建拥有电力(含电网、水电、火电、核电等)建筑行业的成套资质
Zheng Quan Ri Bao Wang· 2026-01-09 14:13
Core Viewpoint - China Energy Engineering Corporation (China Energy) possesses comprehensive qualifications in the power construction industry, including nuclear power engineering consulting, design, construction, and supervision, covering over 90% of the conventional island design and over 60% of the conventional island construction for operational nuclear power plants in China [1] Group 1: Company Qualifications - The company holds a complete set of qualifications in the power construction sector, including nuclear, hydropower, thermal power, and grid construction [1] - China Energy has undertaken significant projects such as the Qinshan Nuclear Power Plant, the first nuclear power station in China, and the Chashma Nuclear Power Plant Phase I, the first nuclear power station exported to Pakistan [1] Group 2: Project Experience - The company has been involved in the construction of various nuclear power projects, including the "Hualong One" and "Guohe One" reactor designs [1] - In addition to its domestic capabilities, China Energy operates two design companies in Spain, which have the capacity for both nuclear island and conventional island design, as well as experience in total package contracts for nuclear power plants [1]