Workflow
Wuhan Tianyuan(301127)
icon
Search documents
武汉天源:关于2025年限制性股票激励计划授予第一类限制性股票登记完成的公告
Core Viewpoint - Wuhan Tianyuan announced the completion of the registration for the first category of restricted stock incentive plan for 2025, indicating a strategic move to incentivize employees and align their interests with the company's performance [1] Summary by Relevant Sections - **Stock Incentive Plan Details** - The first category of restricted stock has a total registration of 10.86 million shares [1] - The grant price for the restricted stock is set at 7.52 yuan per share [1] - A total of 144 individuals are registered to receive these shares [1] - **Stock Listing Information** - The listing date for the first category of restricted stock is January 23, 2026 [1] - **Source of Shares** - The restricted stocks are sourced from the company's repurchased A-share common stocks in the secondary market [1]
武汉天源(301127) - 关于2025年限制性股票激励计划授予第一类限制性股票登记完成的公告
2026-01-23 10:17
特别提示: 根据《上市公司股权激励管理办法》(以下简称"《管理办法》")及深 圳证券交易所、中国证券登记结算有限责任公司深圳分公司的有关规定,武汉 天源集团股份有限公司(以下简称"公司")完成了2025年限制性股票激励计 划(以下简称"激励计划"或"本激励计划")第一类限制性股票(以下简称 "限制性股票")的授予登记工作,现将有关事项说明如下: 一、本激励计划已履行的相关审批程序 (一)2025年11月28日,公司召开第六届董事会薪酬与考核委员会2025年 第三次会议,审议通过了《关于公司<2025年限制性股票激励计划(草案)>及 其摘要的议案》《关于公司<2025年限制性股票激励计划实施考核管理办法>的 | 证券代码:301127 | 证券简称:武汉天源 | 公告编号:2026-007 | | --- | --- | --- | | 债券代码:123213 | 债券简称:天源转债 | | 武汉天源集团股份有限公司 关于2025年限制性股票激励计划授予第一类限制性股票 登记完成的公告 本公司及董事会全体成员保证信息披露的内容真实、准确、完整,没有虚假记 载、误导性陈述或重大遗漏。 议案》《关于核实公司<202 ...
武汉天源1月22日获融资买入4488.65万元,融资余额7.20亿元
Xin Lang Cai Jing· 2026-01-23 01:40
1月22日,武汉天源跌1.07%,成交额2.25亿元。两融数据显示,当日武汉天源获融资买入额4488.65万 元,融资偿还3150.79万元,融资净买入1337.86万元。截至1月22日,武汉天源融资融券余额合计7.21亿 元。 融资方面,武汉天源当日融资买入4488.65万元。当前融资余额7.20亿元,占流通市值的6.07%,融资余 额超过近一年60%分位水平,处于较高位。 分红方面,武汉天源A股上市后累计派现1.75亿元。近三年,累计派现1.56亿元。 责任编辑:小浪快报 融券方面,武汉天源1月22日融券偿还1.49万股,融券卖出1400.00股,按当日收盘价计算,卖出金额 2.46万元;融券余量4.09万股,融券余额71.98万元,超过近一年90%分位水平,处于高位。 资料显示,武汉天源集团股份有限公司位于湖北省武汉市汉南区兴城大道400号天源天骄大厦,成立日 期2009年10月21日,上市日期2021年12月30日,公司主营业务涉及环保装备研发制造与销售、环保工程 建造和环保项目运营服务。主营业务收入构成为:环保整体解决方案73.89%,水处理运营服务及第三 方服务15.06%,高端环保装备制造6.6 ...
武汉天源(301127.SZ):康佳集团、红塔创新拟合计减持不超过2%股份
Ge Long Hui A P P· 2026-01-19 11:57
Group 1 - The core point of the news is that two major shareholders of Wuhan Tianyuan (301127.SZ) plan to reduce their holdings in the company within specified time frames [1][2] Group 2 - Konka Group, holding 13,300,000 shares (2.01% of total shares), plans to reduce its stake by up to 6,602,408 shares (1% of total shares) from February 10 to May 9, 2026 [1] - Konka Group and another major shareholder, China Resources Asset Management (Shenzhen) Co., Ltd., are acting in concert, collectively holding 79,583,973 shares (12.05% of total shares) [1] Group 3 - Hongta Innovation Investment Co., Ltd. holds 16,104,489 shares (2.44% of total shares) and plans to reduce its stake by up to 6,602,408 shares (1% of total shares) from January 23 to April 22, 2026 [2]
武汉天源:股东拟合计减持不超2%公司股份
人民财讯1月19日电,武汉天源(301127)1月19日公告,持股2.01%的股东康佳集团计划以集中竞价交 易方式减持公司股份不超过660.24万股(占总股本1%);持股2.44%的特定股东红塔创新计划以集中竞价 交易方式减持公司股份不超过660.24万股(占总股本1%),合计减持不超过2%。 ...
武汉天源(301127) - 关于公司股东减持股份预披露的公告
2026-01-19 11:18
武汉天源集团股份有限公司 关于公司股东减持股份预披露的公告 本公司股东康佳集团股份有限公司、特定股东红塔创新投资股份有限公司保 证向本公司提供的信息内容真实、准确、完整,没有虚假记载、误导性陈述或重 大遗漏。 本公司及董事会全体成员保证公告内容与信息披露义务人提供的信息一致。 | 证券代码:301127 | 证券简称:武汉天源 | 公告编号:2026-006 | | --- | --- | --- | | 债券代码:123213 | 债券简称:天源转债 | | 特别提示: 1、持有武汉天源集团股份有限公司(以下简称"公司")股份13,300,000 股(占截至2026年1月16日剔除公司最新披露的回购专用证券账户中股份数量后 总股本660,240,804股的2.01%)的股东康佳集团股份有限公司(以下简称"康佳 集团")计划自本公告披露之日起15个交易日后的3个月内(即2026年2月10日 至2026年5月9日),以集中竞价交易方式减持公司股份不超过6,602,408股(占 截至2026年1月16日剔除公司最新披露的回购专用证券账户中股份数量后公司总 股本660,240,804股的1%)。 2、截至本公告披露 ...
武汉天源:截至2025年12月31日股东人数为15621户
Zheng Quan Ri Bao Wang· 2026-01-13 11:12
Group 1 - The core point of the article is that Wuhan Tianyuan (301127) has reported its shareholder count as of December 31, 2025, which stands at 15,621 households [1]
武汉天源夯实业务布局 拟5.5亿投建储能项目
Chang Jiang Shang Bao· 2026-01-12 23:49
Core Viewpoint - Wuhan Tianyuan is making significant investments in the energy storage sector, with a total of 5.5 billion yuan allocated for a new project in Suichuan County, Jiangxi Province, marking the company's second investment in this area within a month. This move aims to enhance the company's business layout in water management, solid waste disposal, green energy, and high-end equipment manufacturing, transitioning green energy from a strategic focus to a core growth driver [1][2]. Investment Details - The investment framework agreement for the "220KV Substation 200MW/400MWh Grid-Side Independent Shared Energy Storage Project" has been signed with the Suichuan County Bureau of Commerce, with a total investment of approximately 5.5 billion yuan funded by the company. The project will cover an area of about 40 acres and is scheduled to commence construction in 2026, with a construction period of four months [2][3]. - The energy storage project is expected to create synergies with over ten existing waste incineration green electricity projects, enhancing the company's business layout and extending its operations from power generation to a full chain of green electricity production, storage, and consumption [2][3]. Revenue Generation and Financial Impact - The energy storage project will enable the company to achieve stable revenue and profit growth through various profit models, including peak-valley arbitrage, grid frequency regulation, and auxiliary services. The long operational cycle of the project is anticipated to generate continuous cash flow, improving the company's cash flow situation and providing financial support for future business expansion [3]. Employee Incentives - The company has implemented a stock incentive plan, granting 1,086,000 shares to 144 core employees, which represents 1.61% of the total share capital. This plan aims to stimulate organizational vitality and is structured with a three-year lock-up period, with shares being released in three phases over 60 months [4].
武汉天源拟5.5亿元投建储能项目
Core Viewpoint - Wuhan Tianyuan Group has signed an investment framework agreement for a 200MW/400MWh energy storage project, marking a significant strategic move into the green energy sector with a total investment of approximately 550 million yuan [1][2]. Group 1: Project Overview - The project involves the construction of an independent electrochemical energy storage station, including components such as lithium iron phosphate batteries, battery management systems (BMS), and energy storage inverters (PCS) [1]. - The project will consist of 44 energy storage units, each with a capacity of 5MW/2×5.015MWh, covering an area of approximately 40 acres, with construction planned to start in 2026 and a duration of 4 months [1]. Group 2: Strategic Implications - The project represents a critical step for Wuhan Tianyuan in the green energy field, enhancing its existing portfolio of over ten waste-to-energy projects and solidifying its business layout in water management, waste disposal, green energy, and high-end equipment manufacturing [1][2]. - The energy storage project allows the company to extend its operations from a single power generation focus to a full chain of green electricity production, storage, and consumption, thereby increasing the added value and risk resilience of its energy business [2]. Group 3: Financial and Operational Benefits - The energy storage project is expected to reduce the company's reliance on its environmental business, diversifying operational risks and enhancing overall business stability and sustainability [2]. - Once operational, the project can generate stable revenue through various profit models, including peak-valley arbitrage, grid frequency regulation, and capacity compensation, contributing to improved cash flow and supporting future business expansion [2].
武汉天源:第六届董事会第二十五次会议决议
Zheng Quan Ri Bao Wang· 2026-01-09 14:13
Core Viewpoint - Wuhan Tianyuan (301127) announced the approval of adjustments to the list of incentive objects and the number of restricted stock grants under the 2025 incentive plan by its sixth board of directors' 25th meeting [1] Group 1 - The company held its sixth board of directors' 25th meeting on January 9 [1] - The meeting approved the proposal regarding the adjustment of the list of incentive objects for the 2025 restricted stock incentive plan [1] - The adjustments include changes to the number of shares granted to the incentive objects [1]