Workflow
东北海陆大通道
icon
Search documents
葫芦岛港绥中港区首迎外贸货轮
Liao Ning Ri Bao· 2025-08-06 01:03
Core Points - The "Chunsheng" vessel, carrying 54,000 tons of South Asian iron ore, has successfully docked at the Suizhong Port, marking the first foreign trade ship to arrive at this newly classified national first-class open port [1] - Suizhong Port has passed national acceptance and is now open with three 50,000-ton general berths, totaling 800 meters in length, and designed to handle an annual throughput capacity of 5.75 million tons [1] - The successful docking of the large cargo ship signifies the activation of Suizhong Port's role as a key gateway for the Northeast land-sea corridor, contributing to the strategic mission of energy distribution and port industry development in the region [1] Industry Impact - Suizhong Port, located at the western end of the Liaoxi Corridor, serves as a critical transportation hub connecting Northeast and North China, enhancing regional economic development [1] - The establishment of a "dual-port" structure with the Liutiaogou Port area will facilitate the energy distribution and port industry development in Northeast China, injecting new momentum into high-quality economic growth in the region [1]
正式获批!大连港口岸扩大开放
Sou Hu Cai Jing· 2025-05-22 08:40
Core Viewpoint - The approval of the expansion of Dalian Port's Taiping Port area represents a significant breakthrough in the development and construction of Dalian Port, enhancing its open capabilities and supporting regional economic growth [1][7]. Group 1: Background and Development - Dalian Port officially opened to the outside world in 1960, and the Taiping Bay Cooperation Innovation Zone was established in 2020, focusing on the integration of port, industry, and city development [3]. - The expansion of Dalian Port was included in the National "14th Five-Year" Port Development Plan in 2021, marking its formal inclusion in national planning [3]. - The application for the expansion was submitted by the Liaoning Provincial Government to the State Council in December 2024, and after five months of efforts, it received approval [3]. Group 2: Infrastructure and Capacity - The Taiping Port area features a U-shaped layout with 26 berths, including container terminals, general and multipurpose terminals, and facilities for shipbuilding and marine equipment manufacturing [5]. - The newly approved berths include two grain and general berths (301 and 302) and one multipurpose berth (105) [5]. Group 3: Strategic Importance - The expansion is expected to leverage opportunities from the "Belt and Road" initiative, the Northeast Land-Sea Corridor, and the Liaoning Coastal Economic Belt, enhancing Dalian Port's functionality [7]. - It will play a crucial role in advancing the "Two Priority Areas" and "Three Centers" construction, providing strong momentum for industrial upgrades and sustainable development in the Taiping Bay Cooperation Innovation Zone [7]. Group 4: Next Steps - The municipal government will collaborate with customs, maritime, border inspection, and relevant groups to expedite the acceptance process for the port expansion and improve infrastructure [8].