募集资金运用
Search documents
艾芬达: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-08-21 05:39
Overview of Fundraising - The company plans to publicly issue no more than 21.67 million shares of RMB ordinary shares (A shares) to raise funds, which will be invested in specific projects after deducting issuance costs [1][2] Fund Utilization - The total investment amount for the projects is 664.68 million RMB, which includes two main projects: the annual production line upgrade project for 1.3 million towel racks and the construction project for an annual production line of 1 million towel racks [2][3] - If the actual funds raised exceed the project funding needs, the excess will be used to supplement working capital related to the company's main business [2][3] - If the actual funds raised are insufficient, the funding gap will be resolved through self-raised funds [2][3] Fund Management - The company has established a "Fund Management Method" to regulate the storage, use, management, and supervision of the raised funds [3] - The raised funds will be stored in a special account managed by the company's board of directors, ensuring that the funds are used for their intended purpose [3] Project Details Project 1: Annual Production Line Upgrade for 1.3 Million Towel Racks - The project will be implemented by the company, with a planned construction period of 18 months, aiming for production capacity to reach 40% in the second year and 90% in the third year, achieving full capacity in the fourth year [4][5] - The project will primarily produce bathroom towel rack products, with various pollution control measures in place for wastewater, waste gas, solid waste, and noise [4][5][6] Project 2: Annual Production Line Construction for 1 Million Towel Racks - Similar to the first project, this project will also have an 18-month construction period, with production capacity targets set for the second, third, and fourth years [7][8] - The project will also implement pollution control measures similar to those in the first project [7][8] Working Capital Supplement - The company plans to use 50 million RMB of the raised funds to supplement working capital to support existing business development and control debt levels [9][10] - The need for working capital arises from the stable growth of the company's business and the increasing demand for operational funds [9][10] - The infusion of working capital is expected to enhance the company's short-term solvency and overall competitiveness in the market [10]
广东建科: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-07-23 19:13
广东省建筑科学研究院集团股份有限公司 关于募集资金具体运用情况 (一)创新技术研究院总部建设项目 创新技术研究院总部建设项目实施主体为发行人全资子公司创新研究院。创 新研究院拟在已购置的中山翠亨新区土地上建设创新技术研究院总部产业基地。 项目建设内容包括建设 7 个研究中心(科技发展中心、建筑大数据研究中心、智 慧城市研究中心、BIM 技术研究中心、生态环境研究中心、城市更新研究中心、 新型建材研究中心)所需的办公、研发、实验、培训及配套用房、购置设备(含 软件)、引进人才等。项目预计新建建筑面积 32,250 平方米,购置设备(含软件) 本项目建设完成达产后,预计首年新增销售收入 13,360 万元,首年新增净 利润 4,224 万元,内部收益率(税后)为 10.59%,税后静态投资回收期为 8.92 年(含建设期),动态投资回收期为 11.67 年(含建设期)。 该项目实施后财务运营状况良好,具有较好的盈利水平。 本项目预计总投资 38,691.72 万元。 (1)总体投资情况 单位:万元 项目 金额 占比 工程费用 22,729.75 57.31% 工程建设其他费 3,370.09 8.50% 预备费 ...
悍高集团: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-07-10 13:08
Core Viewpoint - The company plans to publicly issue no less than 40.01 million shares of common stock, with the post-issue circulating shares accounting for at least 10% of the total shares [1] Fund Utilization - The total expected investment for the projects is 643.47 million yuan, with 420 million yuan to be raised through this public offering [2] - The company will initially use self-raised funds for the projects before the raised funds are available, and will replace the self-raised funds with the raised funds once they are in place [2] Project Summaries 1. Intelligent Home Hardware Automation Manufacturing Base - The project aims to establish an intelligent production line for home hardware by introducing advanced equipment and information systems, enhancing production capacity and efficiency to meet growing market demand [3] - Total investment for this project is 561.17 million yuan, with 370 million yuan expected to be funded from the raised funds [3] - The project is scheduled to be completed within 36 months, with various phases including preparation, engineering implementation, and personnel training [3] 2. R&D Center Construction Project - This project will upgrade the R&D and design environment by introducing advanced equipment and renovating laboratories, thereby enhancing the company's R&D capabilities [4] - Total investment is 52.26 million yuan, with 30 million yuan to be funded from the raised funds [4] - The project will also take 36 months to complete, focusing on project preparation and engineering implementation [4] 3. Information Technology Construction Project - The project aims to integrate various management modules such as ERP, R&D management, and supply chain management to improve internal management efficiency and facilitate collaboration across the company [4] - Total investment is 30.04 million yuan, with 20 million yuan to be funded from the raised funds [4] - The project will also be completed within 36 months, focusing on software development and personnel training [4]
新恒汇: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-05-29 13:24
Fundraising Utilization Plan - The company plans to invest the raised funds in two main projects: "High-Density QFN/DFN Packaging Material Industrialization Project" and "R&D Center Expansion and Upgrade Project" with a total investment of 518.63 million yuan [1][2] - The total amount of funds raised, after deducting issuance costs, will be fully allocated to these projects [2] Fund Management System - The company has established a management system for the raised funds, which includes regulations on special account storage, usage, changes in fund purposes, management, and supervision [2] - The board of directors is responsible for the effective execution of the fundraising management system, ensuring that the funds are stored in a designated special account [2] Project Timeline and Progress - The construction period for the High-Density QFN/DFN Packaging Material Industrialization Project is 24 months, involving engineering design, civil engineering, equipment procurement, and trial operation [2] - The R&D Center Expansion Project has a construction period of 18 months, focusing on engineering design, renovation, and equipment installation [2] Environmental Impact - The High-Density QFN/DFN Packaging Material Industrialization Project will produce minimal wastewater and waste, with noise levels meeting national standards [3] - The R&D Center Expansion Project will primarily generate solid waste such as paper, with no significant environmental pollution expected during its operation [3]