募集资金运用

Search documents
广东建科: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-07-23 19:13
广东省建筑科学研究院集团股份有限公司 关于募集资金具体运用情况 (一)创新技术研究院总部建设项目 创新技术研究院总部建设项目实施主体为发行人全资子公司创新研究院。创 新研究院拟在已购置的中山翠亨新区土地上建设创新技术研究院总部产业基地。 项目建设内容包括建设 7 个研究中心(科技发展中心、建筑大数据研究中心、智 慧城市研究中心、BIM 技术研究中心、生态环境研究中心、城市更新研究中心、 新型建材研究中心)所需的办公、研发、实验、培训及配套用房、购置设备(含 软件)、引进人才等。项目预计新建建筑面积 32,250 平方米,购置设备(含软件) 本项目建设完成达产后,预计首年新增销售收入 13,360 万元,首年新增净 利润 4,224 万元,内部收益率(税后)为 10.59%,税后静态投资回收期为 8.92 年(含建设期),动态投资回收期为 11.67 年(含建设期)。 该项目实施后财务运营状况良好,具有较好的盈利水平。 本项目预计总投资 38,691.72 万元。 (1)总体投资情况 单位:万元 项目 金额 占比 工程费用 22,729.75 57.31% 工程建设其他费 3,370.09 8.50% 预备费 ...
悍高集团: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-07-10 13:08
Core Viewpoint - The company plans to publicly issue no less than 40.01 million shares of common stock, with the post-issue circulating shares accounting for at least 10% of the total shares [1] Fund Utilization - The total expected investment for the projects is 643.47 million yuan, with 420 million yuan to be raised through this public offering [2] - The company will initially use self-raised funds for the projects before the raised funds are available, and will replace the self-raised funds with the raised funds once they are in place [2] Project Summaries 1. Intelligent Home Hardware Automation Manufacturing Base - The project aims to establish an intelligent production line for home hardware by introducing advanced equipment and information systems, enhancing production capacity and efficiency to meet growing market demand [3] - Total investment for this project is 561.17 million yuan, with 370 million yuan expected to be funded from the raised funds [3] - The project is scheduled to be completed within 36 months, with various phases including preparation, engineering implementation, and personnel training [3] 2. R&D Center Construction Project - This project will upgrade the R&D and design environment by introducing advanced equipment and renovating laboratories, thereby enhancing the company's R&D capabilities [4] - Total investment is 52.26 million yuan, with 30 million yuan to be funded from the raised funds [4] - The project will also take 36 months to complete, focusing on project preparation and engineering implementation [4] 3. Information Technology Construction Project - The project aims to integrate various management modules such as ERP, R&D management, and supply chain management to improve internal management efficiency and facilitate collaboration across the company [4] - Total investment is 30.04 million yuan, with 20 million yuan to be funded from the raised funds [4] - The project will also be completed within 36 months, focusing on software development and personnel training [4]
新恒汇: 募集资金具体运用情况
Zheng Quan Zhi Xing· 2025-05-29 13:24
Fundraising Utilization Plan - The company plans to invest the raised funds in two main projects: "High-Density QFN/DFN Packaging Material Industrialization Project" and "R&D Center Expansion and Upgrade Project" with a total investment of 518.63 million yuan [1][2] - The total amount of funds raised, after deducting issuance costs, will be fully allocated to these projects [2] Fund Management System - The company has established a management system for the raised funds, which includes regulations on special account storage, usage, changes in fund purposes, management, and supervision [2] - The board of directors is responsible for the effective execution of the fundraising management system, ensuring that the funds are stored in a designated special account [2] Project Timeline and Progress - The construction period for the High-Density QFN/DFN Packaging Material Industrialization Project is 24 months, involving engineering design, civil engineering, equipment procurement, and trial operation [2] - The R&D Center Expansion Project has a construction period of 18 months, focusing on engineering design, renovation, and equipment installation [2] Environmental Impact - The High-Density QFN/DFN Packaging Material Industrialization Project will produce minimal wastewater and waste, with noise levels meeting national standards [3] - The R&D Center Expansion Project will primarily generate solid waste such as paper, with no significant environmental pollution expected during its operation [3]