河湖生态保护
Search documents
“十四五”时期水利基础设施建设全面提速 淮河流域新增水库库容二十五亿立方米
Ren Min Ri Bao· 2026-01-27 01:21
Group 1 - The core viewpoint of the article highlights the significant investment and progress in water management and infrastructure in the Huai River basin during the 14th Five-Year Plan period, with a total investment of 606 billion yuan, which is 1.63 times that of the previous five-year period [1] - By the end of the 14th Five-Year Plan, all 38 projects identified by the State Council for further management of the Huai River have commenced, with 17 projects completed and accepted [1] - The capacity of newly constructed reservoirs in the basin has increased by 2.5 billion cubic meters, with flood control capacity reaching 1.09 billion cubic meters, enhancing the flood control engineering system [1] Group 2 - The evaluation of river and lake health in the Huai River basin has been fully completed, achieving the revival goals for nine major rivers and lakes, and establishing over 2,200 happiness rivers and lakes at various administrative levels [1] - Water resource utilization has been effectively controlled, with total water usage maintained within 72.4 billion cubic meters, and groundwater extraction reduced by over 15% compared to the end of the 13th Five-Year Plan [2] - The effective utilization coefficient of irrigation water in farmland has reached 0.609, with water consumption per unit of GDP and industrial added value significantly better than the national average [2]
“源头活水”润红城
Xin Lang Cai Jing· 2025-12-21 22:46
Core Viewpoint - The water management initiatives in Zunyi City are significantly enhancing water infrastructure, ecological protection, and urban-rural water supply, contributing to high-quality economic and social development [4][10]. Group 1: Water Infrastructure Development - During the "14th Five-Year Plan" period, Zunyi City has initiated 440 key water projects with an investment of approximately 31.5 billion yuan, marking a historical high [4][5]. - The construction of the Guanyin Reservoir, the largest water conservancy project in Zunyi, involves over 700 workers and more than 100 pieces of machinery, aiming for water storage by 2026 [4][5]. - The city has completed the construction of 9 reservoirs with a total capacity of 1.59 billion cubic meters and has increased the water supply capacity by 3.28 billion cubic meters [5]. Group 2: Urban and Rural Water Supply - Zunyi City has established 4 new urban water supply plants, increasing daily water supply capacity by 145,000 tons, and implemented 22 rural water supply projects [5]. - By the end of the "14th Five-Year Plan," the rural tap water coverage rate is expected to reach 95%, with a rural scale water supply rate of 57% [5]. Group 3: Ecological Protection and River Management - The Tianmen River Wetland Park exemplifies successful river management, promoting a harmonious coexistence between people and nature [6][7]. - Zunyi City has implemented a river chief system to enhance river and lake ecological protection, focusing on comprehensive governance and pollution control [7][9]. - The city has achieved a surface water quality rate of 97.9% and maintained a 100% compliance rate for drinking water sources [8][9]. Group 4: Water Safety and Disaster Prevention - Zunyi City has undertaken multiple projects to manage river systems and mitigate flood risks, protecting over 1.12 million people and 274,600 acres of farmland [9]. - The city has also implemented 82 dam reinforcement projects, restoring a reservoir capacity of 64 million cubic meters [9]. Group 5: Future Directions - The Zunyi Water Authority aims to further integrate water safety, resource management, pollution prevention, and environmental protection, enhancing water service support for economic and social development [10].