Workflow
矿场升级扩产
icon
Search documents
中国铁钛(00893.HK):毛岭-羊龙山铁矿升级扩产
Ge Long Hui· 2025-09-30 10:33
格隆汇9月30日丨中国铁钛(00893.HK)公告,于2025年9月30日,公司的间接全资子公司阿坝矿业与承包 商订立施工合约,据此,在施工合约的条款及条件规限下,承包商须就矿场升级扩产的施工及工程作业 提供服务,合约总额为人民币3400万元。 公司已强调高品位铁矿场业务的战略重要性,计划发展及进一步扩大高品位铁矿场业务。公司早前亦曾 于2021年至2024年在多份公告、中期报告及年报中提供多项业务最新消息,内容有关该等扩大及优化运 营效率的战略举措。公司进一步披露,公司一直逐步进行扩大及优化运营效率的相关采矿工程作业,包 括评估运营及生产规划扩大高品位铁矿场业务。 自2024年12月复产以来,高品位铁矿场业务趋于稳定,惟其现有的现场升级及逐步扩展工程不时断续地 进行,对规模经济造成不同程度的影响及干扰。尽管如此,集团有意评估下一阶段现场升级及扩展的可 行性,以期在更长远的时间内维持、扩大及优化高品位铁矿场业务的整体生产力,原因在于集团相信, 作为集团策略扩展计划的一部分,在完成资源整合程序后有必要进行该等商业评估及技术评估。 因此,升级及扩大毛岭-羊龙山铁矿的策略性决定乃建基于集团于2023年完成的资源整合 ...
中国铁钛(00893)附属订立3400万元施工合约 用于矿场升级扩产
智通财经网· 2025-09-30 10:30
Core Viewpoint - China Iron Titanium (00893) has announced a construction contract with Zhejiang Zhongxiang Construction Group Co., Ltd. for the upgrade and expansion of its mining operations, with a total contract value of RMB 34 million [1] Group 1: Contract Details - The contract is set to be executed by the company's wholly-owned subsidiary, Aba Mining, and is aimed at providing services for the construction and engineering work related to the mine upgrade and expansion [1] - The total value of the contract is RMB 34 million [1] Group 2: Strategic Plans - The strategic plan aims to optimize and upgrade production capacity on a commercial scale, with an expected annual increase in iron concentrate production capacity of approximately 30% to 40% at the Maoling-Yanglongshan Iron Mine [1] - The company anticipates that, barring unforeseen circumstances, this upgrade will enhance economies of scale and reduce unit production costs [1]
中国铁钛附属订立3400万元施工合约 用于矿场升级扩产
Zhi Tong Cai Jing· 2025-09-30 10:29
Core Viewpoint - China Iron Titanium (00893) announced a construction contract with Zhejiang Zhongxiang Construction Group Co., Ltd. for upgrading and expanding its mining operations, with a total contract value of RMB 34 million [1] Group 1: Contract Details - The contract was signed by the company's indirect wholly-owned subsidiary, Aba Mining, and is aimed at providing services for the upgrade and expansion of the mining site [1] - The total value of the construction contract is RMB 34 million [1] Group 2: Strategic Plans - The strategic plan aims to optimize and upgrade production capacity to a full commercial scale [1] - The annual production capacity of iron concentrate at the Mao Ling-Yang Long Mountain Iron Mine is expected to increase by approximately 30% to 40% [1] - The plan is designed to enhance economies of scale and reduce unit production costs, barring unforeseen circumstances [1]