综合立体交通枢纽

Search documents
湖北省委书记王忠林会见交通运输部党组书记、部长刘伟
Xin Lang Cai Jing· 2025-08-25 11:28
Core Viewpoint - The meeting between Hubei provincial leaders and the Ministry of Transport emphasizes the importance of enhancing transportation infrastructure in Hubei to support its development and contribute to national transportation goals [1] Group 1: Government Initiatives - Hubei's provincial leadership is advocating for the inclusion of major projects such as the Han-Xiang-Gui inland shipping corridor, highway upgrades, and Yangtze River crossing channels into national planning [1] - The aim is to transform Hubei's geographical advantages into a development advantage, positioning it as a key transportation hub in the region [1] Group 2: Collaboration and Project Development - There was a discussion on deepening cooperation between the Ministry of Transport and Hubei province to accelerate the construction of significant projects like the Yangtze and Han River channel improvements [1] - The focus is on creating a "Golden Waterway" along the Yangtze River and establishing a multi-modal transport hub in the middle and upper reaches of the Yangtze River [1] - The collaboration aims to support Hubei in reconstructing its open channels and developing a modern logistics system characterized by low costs, high efficiency, and wide reach [1]
年内4条高速建成通车,济宁重点交通基础设施项目畅通发展新动脉
Qi Lu Wan Bao Wang· 2025-07-01 07:03
Core Points - The construction of the Xiongshang High-speed Railway Liangshan section is accelerating, with track laying set to begin in October, reducing travel time from Liangshan to Beijing to under 2 hours [1][3] - Multiple transportation projects, including highways and railways, are progressing rapidly, enhancing the regional transportation network and promoting economic integration with the provincial capital and the Beijing-Tianjin-Hebei region [1][7] Group 1: High-speed Railway Development - The Xiongshang High-speed Railway Liangshan section is a key project, with the main bridge spanning 1600 meters and innovative construction techniques reducing the beam construction cycle from 21 days to 15 days [2][3] - The project is part of China's "Eight Vertical and Eight Horizontal" high-speed railway network, with a total length of 552 kilometers, and the Liangshan section measuring 19.1 kilometers [3][4] - The Liangshan area is establishing a comprehensive transportation hub, with supporting infrastructure such as a passenger transport hub and a command and dispatch center being developed [3][4] Group 2: Highway Projects - The Jishang Expressway has achieved over 60 billion yuan in investment, with over 95% of the roadbed and bridge works completed, aiming for early completion [4][5] - The Jizhou Expressway is also progressing well, with 94.2% of the roadbed and 44.6% of the pavement works completed, enhancing regional connectivity [5][6] - The completion of these expressways will significantly improve transportation efficiency and alleviate traffic pressure in the region [6] Group 3: Integrated Transportation Network - Jining is leveraging the opportunity of building a transportation stronghold in Shandong, focusing on interconnectedness and high-quality development [7][8] - The city has initiated a "Hundred-Day Hard Work" campaign to accelerate project construction, with a total railway length of 836 kilometers established [7][8] - The port's cargo throughput reached 45.02 million tons in the first five months, a 12% increase year-on-year, indicating robust growth in the logistics sector [8]