济邹高速

Search documents
年内4条高速建成通车,济宁重点交通基础设施项目畅通发展新动脉
Qi Lu Wan Bao Wang· 2025-07-01 07:03
Core Points - The construction of the Xiongshang High-speed Railway Liangshan section is accelerating, with track laying set to begin in October, reducing travel time from Liangshan to Beijing to under 2 hours [1][3] - Multiple transportation projects, including highways and railways, are progressing rapidly, enhancing the regional transportation network and promoting economic integration with the provincial capital and the Beijing-Tianjin-Hebei region [1][7] Group 1: High-speed Railway Development - The Xiongshang High-speed Railway Liangshan section is a key project, with the main bridge spanning 1600 meters and innovative construction techniques reducing the beam construction cycle from 21 days to 15 days [2][3] - The project is part of China's "Eight Vertical and Eight Horizontal" high-speed railway network, with a total length of 552 kilometers, and the Liangshan section measuring 19.1 kilometers [3][4] - The Liangshan area is establishing a comprehensive transportation hub, with supporting infrastructure such as a passenger transport hub and a command and dispatch center being developed [3][4] Group 2: Highway Projects - The Jishang Expressway has achieved over 60 billion yuan in investment, with over 95% of the roadbed and bridge works completed, aiming for early completion [4][5] - The Jizhou Expressway is also progressing well, with 94.2% of the roadbed and 44.6% of the pavement works completed, enhancing regional connectivity [5][6] - The completion of these expressways will significantly improve transportation efficiency and alleviate traffic pressure in the region [6] Group 3: Integrated Transportation Network - Jining is leveraging the opportunity of building a transportation stronghold in Shandong, focusing on interconnectedness and high-quality development [7][8] - The city has initiated a "Hundred-Day Hard Work" campaign to accelerate project construction, with a total railway length of 836 kilometers established [7][8] - The port's cargo throughput reached 45.02 million tons in the first five months, a 12% increase year-on-year, indicating robust growth in the logistics sector [8]