皖能电力(000543) - 000543皖能电力投资者关系管理信息2025-09
2025-09-17 02:32
Group 1: Company Operations - The total installed capacity of the company has reached 1,787 MW, with coal power at 1,317 MW, gas power at 90 MW, biomass at 33.5 MW, hydropower (pumped storage) at 140 MW, wind power at 100 MW, and solar power at an unspecified capacity [3] - The operational and under-construction capacity totals 1,627 MW, with 140 MW of pumped storage and 97 MW of wind power awaiting approval [3] Group 2: Performance Metrics - In the first half of 2025, the company's electricity generation was 27.38 billion kWh, a decrease of 3.9% year-on-year, but there was a recovery in July and August with a growth of over 7% [3] - The average comprehensive tax-inclusive electricity price for the first half of 2025 was 0.429 CNY/kWh, a decline of 4% compared to the previous year [3] - The average coal price for the first half of 2025 was below 800 CNY/ton, a significant drop of 14%, which exceeded the decline in electricity prices [3] - The profit per kWh for the first half of 2025 increased by 1.4 CNY/kWh year-on-year [3] Group 3: Development Plans - Current projects include the Turpan wind power project with a capacity of 50 MW, expected to be fully connected by the end of September 2025 [3] - A 80 MW solar power project in Xinjiang is also planned for full capacity connection by September 2025 [3] - A 140 MW wind power project in the province is scheduled for full capacity connection by November 30, 2026 [3] Group 4: Q&A Insights - The profit per kWh for the Xinjiang power plant exceeds 0.1 CNY/kWh [4] - The pricing mechanism for electricity from Xinjiang to East China is based on a "benchmark + floating" model, with no price increase observed this year [4] - The electricity price in Anhui province is under a long-term agreement renewed annually, with expected downward pressure on prices next year [4] - The proportion of medium to long-term contract electricity volume for the company is expected to exceed 90% [3]