Workflow
防洪工程
icon
Search documents
惠州一重点民生项目总投资约3.9亿元,环评受理公示
Nan Fang Du Shi Bao· 2026-01-05 15:18
1月4日,惠州市生态环境局发布《建设项目受理信息公示》,惠州市增江龙门段治理工程概算总投资 38952 万元,施工期共24个月,该局环境影响评价与排放管理科已正式受理该项目的环境影响评价文 件,现进行受理公示,公示期为10个工作日。 根据惠州市生态环境局发布的《建设项目受理信息公示》,本次受理公示旨在体现公开、公正原则,接 受社会监督。公示期自公告发布之日起10个工作日内,公众可通过以下途径反馈意见或查询信息。 在公示期内,公众可通过来信或来电向惠州市生态环境局反映意见。联系地址:惠州市惠城区江北三新 北路31号市民服务中心7号楼(邮编:516001),联系电话:(0752) 2167968。 公示附有《环境影响报告书(报批稿公示版)》及《公参说明公示版》等关键文件的下载链接,公众可 自行查阅详情。此次受理公示,是在完成前期公众参与程序后,项目报批前的法定环节。 信息公示 这标志着该项目前期工作进入新阶段,并再次为公众提供了重要的知情与监督窗口。关切该项目环境影 响的单位和个人,可充分利用本次受理公示期,通过官方渠道查询详细信息、反馈合理意见。 重点民生项目,提升区域防洪能力 公示信息显示,"惠州市增江龙门段 ...
视频丨未能有效防范灾情 菲律宾防洪工程遭质疑
Core Insights - Typhoon "Seagull" has resulted in at least 114 deaths and 127 missing persons in the Philippines, with over 2.14 million people affected [1] - Despite significant investments in flood control infrastructure, these measures failed to mitigate the disaster's impact [4] Group 1: Disaster Impact - The typhoon has caused extensive damage in Cebu province, with local reports highlighting the destruction of homes and loss of food supplies [2] - The Philippine National Disaster Risk Reduction and Management Council reported the scale of the disaster, emphasizing the human toll and widespread displacement [1] Group 2: Infrastructure and Investment - Cebu province ranks second in the number of flood control projects in the Philippines, with over 414 projects planned from 2022 to 2025, valued at approximately 26.6 billion pesos (around 3.2 billion RMB) [4] - The effectiveness of these flood control measures has been called into question, as they were described as inadequately constructed, merely bundling stones with wire [4] Group 3: Government Response - The Philippine Department of Public Works and Highways acknowledged shortcomings in planning and execution of flood control measures, indicating a need for an independent investigation into the failures [6]
三方合力推进建设!黄茅峡水库建设座谈会召开
Nan Fang Nong Cun Bao· 2025-10-31 04:34
Core Viewpoint - The Huangmaoxia Reservoir construction meeting was held to accelerate the project, which is a significant water conservancy initiative aimed at flood control and comprehensive utilization, including navigation, irrigation, and power generation [2][5][11]. Group 1: Project Overview - The Huangmaoxia Reservoir is located on the Lianjiang River in Qingyuan, with a total storage capacity of 570 million cubic meters and a total investment of 12.388 billion yuan [6]. - The project officially commenced on July 22, 2025, and aims to enhance the flood control system in the middle and lower reaches of the Beijiang River, alleviating flood pressure on cities like Guangzhou and Foshan [7][6]. Group 2: Current Progress - As of now, 19 culvert foundations have been excavated and constructed, with 7.6 kilometers of access roads cleared and 47,000 cubic meters of earthwork completed [8][9]. - The focus is on commencing the main construction work by November [10]. Group 3: Strategic Goals - The project is not only a flood control initiative but also a long-term public welfare project, aiming to be a benchmark for quality and sustainability [11][12]. - The meeting emphasized the need for high standards in project planning and execution, integrating it with broader development initiatives [12][13]. Group 4: Collaborative Efforts - The meeting highlighted the importance of collaboration between the provincial water resources department and the Qingyuan municipal government to address challenges effectively [15][20]. - The project will leverage the strengths of the Yuehai Group in funding, technology, and talent, incorporating advanced management techniques such as digital twin technology [21][22].
黄河兰州城区段“秋补”防洪短板
Zhong Guo Xin Wen Wang· 2025-09-18 06:59
Core Points - The article discusses the initiation of the "Yellow River Mainstream Lanzhou Urban Section Flood Control Improvement Project" aimed at addressing flood control deficiencies in Lanzhou [1][3] - The project will enhance levees that do not meet the 100-year flood design standard by raising levees and adding wave-dissipation facilities, expected to be completed by the end of October [1][3] Group 1: Project Details - The project involves the urban sections of Lanzhou, specifically in Chengguan District, Qilihe District, and Anning District [1] - The total length of the riverbank in the Lanzhou urban section is 95 kilometers, developed over 60 years through multiple construction phases [3] - The upgrade aims to eliminate potential safety risks and create a more complete and reliable flood control system [3] Group 2: Environmental and Aesthetic Considerations - The project is designed to better cope with extreme weather events potentially caused by climate change, ensuring the city's operational safety during such conditions [3] - The engineering approach integrates urban aesthetics, utilizing "flower pool wave-dissipation walls, glass wave-dissipation walls, and prefabricated wave-dissipation walls" to harmonize with the Yellow River scenic area [3]