RibbonFET
Search documents
英特尔 18A ,真的干成了
半导体行业观察· 2026-02-11 01:27
英特尔最先进的制造工艺——18A节点,既象征着工程技术的雄心壮志,也预示着商业上的不确定 性。这项技术——最初应用于英特尔的Panther Lake处理器——验证了多项可能重新定义半导体设计 的突破性成果。然而,截至2026年初,行业合作伙伴仍迟迟不愿做出承诺,这恰恰反映出英特尔新架 构的颠覆性。 英特尔的 18A 工艺的核心是背面供电网络 (BSPDN),这是一种结构上的重大改进,英特尔内部称之 为 PowerVia。BSPDN 不再像以前那样通过芯片的顶层供电,而是将供电电路移到了芯片背面。 这为晶圆正面清理出空间,从而加快信号布线速度,提高性能密度和电源效率。这是对数十年来正面 电源管理方式的重大革新,标志着英特尔首次将 PowerVia 与其全环栅晶体管设计 RibbonFET 相结 合,应用于完整的生产节点。 公众号记得加星标⭐️,第一时间看推送不会错过。 目前,英特尔已经证明其18A工艺行之有效,而且效果显著,但要将这种成功转化为代工量产,需要 的不仅仅是技术领先地位。它还需要说服整个生态系统从根本上重塑其设计理念。 参考链接 https://www.techspot.com/news/11126 ...
一颗1.8纳米芯片,成了英特尔「最后的救赎」
投中网· 2025-10-10 06:33
Core Viewpoint - Intel is at a critical juncture, with its future hinging on the Panther Lake chip, which is expected to demonstrate the viability of its 18A process technology and restore confidence among investors, government, and potential customers [5][11][21]. Summary by Sections Panther Lake Overview - Panther Lake is Intel's first client system-on-chip (SoC) based on the 18A process node, integrating CPU, GPU, and dedicated AI accelerators, aiming to balance efficiency and performance [7][8]. - The chip offers configurations from 8 to 16 cores, with the top model featuring 12 GPU cores and ray tracing units, claiming over 50% performance improvement compared to the previous generation [7][8]. Technological Advancements - The 18A process, representing a 1.8 nm technology node, is touted as the most advanced semiconductor process developed and manufactured in the U.S. to date [8]. - Key innovations include RibbonFET and PowerVia technologies, which enhance performance by up to 15% and improve chip density by approximately 30% compared to the previous generation [8][9]. Strategic Importance - Panther Lake is seen as a pivotal product for Intel, not just for its performance but as a demonstration of its manufacturing capabilities, which are crucial for regaining market trust [11][14]. - The chip is expected to compete directly with Apple's M series, AMD Ryzen, and Qualcomm Oryon chips, making its success vital for Intel's position in the laptop market [17][20]. Financial and Market Context - Intel has faced significant challenges, including market share loss to AMD and Apple, and has undergone substantial restructuring, including layoffs and a shift in strategy under new CEO Pat Gelsinger [12][13]. - Recent investments from the U.S. government and Nvidia, totaling approximately $139 billion, have provided Intel with a financial lifeline, but the company must deliver on Panther Lake to maintain this support [14][18]. Future Outlook - Panther Lake is set to begin mass production in late 2025, with a clear timeline for market availability starting January 2026 [16]. - The success of Panther Lake will not only impact Intel's client products but also its future server products, such as the Clearwater Forest processor, which is planned for release in 2026 [9][18].