Workflow
地月空间激光角反射器
icon
Search documents
中国研制成功新一代地月空间激光角反射器,助力卫星激光测距;英国南安普敦大学开设全球第二家电子束光刻工厂丨智能制造日报
创业邦· 2025-05-06 03:41
Group 1 - Trina Storage, a subsidiary of Trina Solar, has partnered with US-based FlexGen to deliver a grid-scale battery storage system in Houston, Texas, with a capacity of 371 MWh, utilizing Trina's Elementa King Kong 2 storage solution to enhance system efficiency and reduce cost per kilowatt-hour [1] - The University of Southampton in the UK has opened the world's second electron beam lithography factory, which is the first of its kind outside Japan and the first advanced semiconductor factory in Europe, utilizing high-energy electrons for direct writing of semiconductor circuit patterns [1] - The Zhejiang Songyang Pumped Storage Power Station in China has successfully completed the precision drilling of the country's deepest pumped storage vertical shaft, achieving a directional drilling length of 516 meters with a maximum daily advance of 85.5 meters, demonstrating industry-leading standards in drilling accuracy [1] Group 2 - A Chinese research team has successfully developed a new generation of lunar laser retroreflectors, enabling satellite laser ranging to measure the distance to the moon, marking a significant achievement in space technology [1]
我国新一代地月空间激光角反射器实现白天卫星激光测距;全球最大“人造太阳”完成其“电磁心脏”组件制造丨智能制造日报
创业邦· 2025-05-03 02:42
Group 1 - The successful demonstration of satellite laser ranging technology for the new generation lunar space laser retroreflector marks a significant breakthrough in precise measurement technology in deep space orbits, achieved by the "Tiandu No. 1" satellite navigation technology experimental team [1] - The completion of all components for the world's largest and strongest pulsed superconducting electromagnet system by the ITER organization represents a milestone achievement in fusion energy, with the final component being the sixth module of the central solenoid manufactured in the USA [1] - The engineering assembly of the compact fusion energy experimental device (BEST) has officially started two months ahead of schedule, aiming to demonstrate fusion energy generation for the first time, building on the previous EAST device [1] Group 2 - The launch of Jiangsu's first incremental distribution network virtual power plant signifies a step forward in smart energy management, with the platform integrating 26 megawatts of distributed solar power, 105 kilowatts of energy storage, and 145 megawatts of adjustable load [1]