Workflow
智能养护
icon
Search documents
湖北荆州李埠长江公铁大桥双主塔封顶
Zhong Guo Jing Ji Wang· 2026-02-10 06:35
Core Viewpoint - The completion of the main towers of the Jingzhou Liubu Yangtze River Bridge marks a significant advancement in the construction phase, transitioning to the upper structure work, which will accelerate the overall project timeline [1] Group 1: Project Overview - The bridge features two main towers with heights of 215.5 meters and 220.5 meters, respectively, and will support a total length of 1723 meters with a main span of 1120 meters [1] - The bridge is designed to accommodate both road and rail traffic, with a layered structure that includes a six-lane highway on the upper level and a dual-line high-speed railway on the lower level [2] Group 2: Technological Innovations - A lightweight intelligent tower construction machine has been developed to enhance construction precision and efficiency, achieving a 30% increase in construction speed and a 40% reduction in labor [1][2] - The project incorporates a "smart neural system" for automatic curing of concrete and a 5G remote control system for tower cranes, improving safety and operational efficiency [2] Group 3: Future Developments - The next phase of the project will focus on the installation of catwalks and main cable erection, with the bridge expected to be completed and operational by May 2028 [3] - Upon completion, the bridge will enhance connectivity between major highways and railways, contributing to regional economic development and integration [3]