Workflow
济南轨道交通济阳线
icon
Search documents
济南“轨道上的黄河时代”加速到来
Qi Lu Wan Bao· 2026-01-02 17:25
轨道交通济阳线开通首日,市民排队"尝鲜"。图据济南轨道交通公众号 轨道交通济阳线自济南东站驶出,一路跨过黄河到达济阳区。 2025年12月30日,济南轨道交通济阳线开通,济南黄河北岸进入"轨道交通时代"。作为济南首条开通的跨 黄轨道交通线路,全长36.1公里的济阳线如何打破黄河的物理阻隔,在交通变革中重塑城市空间、激活区 域协同? 记者于泊升济南报道 跨黄轨道迎来"首秀" 市民过河"一键刷新" "以前去济南东站或者市区常选择开车,现在坐济阳线一路直达,2元票价,还不用操心停车问题。"2025年 12月30日上午,家住起步区的市民李娟(化名)成为济阳线的首批乘客,列车穿越黄河时,她用手机记录下这 一时刻。 作为济南首条开通的跨黄轨道交通线路,济阳线的投用绝非简单的交通线路延伸,而是对黄河北岸居民出 行模式、生活半径的一次重塑。 对跨河通勤族而言,济阳线带来的不仅是"时空压缩"。在起步区某智能制造企业工作的张明明(化名),家 住历城区,以前自驾通勤早晚高峰耗时近1小时,每月油费、停车费支出超过1000元。"现在从家步行10分 钟到站点,30分钟就能到公司楼下,2元的单一票价,每月通勤成本100元左右。" 济南轨道 ...
北跨落关键一子,济南如何启幕“轨道上的黄河时代”
Qi Lu Wan Bao Wang· 2025-07-11 09:17
Core Viewpoint - The launch of the Jinan Tramway, specifically the Jiyang Line, marks a significant step towards enhancing transportation connectivity between the main urban area and the Jiyang District, initiating the "Yellow River Era" in Jinan [1][3] Group 1: Project Overview - The Jiyang Line is the first urban rail project to cross the Yellow River and features a total length of approximately 35.51 kilometers, connecting Jinan East Station to Jiyang District with 16 stations along the route [3][4] - The expected completion date for the Jiyang Line is by the end of 2025, which will reduce travel time from the main urban area to Jiyang District to 40 minutes [3][6] Group 2: Additional Infrastructure Developments - The Jinan Metro Line 7, another significant project, spans about 30 kilometers and includes 23 stations, with construction progressing well as of June [4][6] - The anticipated completion date for Metro Line 7 is by the end of 2027, which will enhance connectivity with existing metro lines [6] Group 3: Strategic Importance - The construction of cross-Yellow River rail transit is aligned with Jinan's urban development strategy, promoting coordinated growth between the main urban area and northern regions [7][8] - The project aims to facilitate the movement of talent, capital, and technology to the northern areas, thereby driving industrial upgrades and urban development [8][11] Group 4: Broader Implications - The cross-Yellow River rail transit will address traffic congestion issues in Jinan by providing an efficient alternative to private car usage, thus improving overall urban mobility [11] - The project is expected to attract population and industry to the northern regions, fostering a multi-center urban development model [11]