Workflow
电动汽车充电器
icon
Search documents
沙特电动汽车充电器工厂奠基
Shang Wu Bu Wang Zhan· 2025-12-17 16:44
《经济报》12月9日报道,沙特东部省萨勒曼国王能源园城(SPARK)今日正式启动智能出行工厂 建设,该工厂专注于电动汽车充电器的生产。同时,位于沙特东部阿布盖格工业城的首个电动汽车充电 站也正式启用。该项目是支持沙特产业本地化战略的关键一步,也是在本地化政策框架下,在本地化内 容和政府采购管理局的监督下,加强"沙特制造"计划的重要举措。Smart Mobility 首席执行官法赫德·本· 纳瓦夫亲王说,在 SPARK 建立该工厂是战略研究和规划的结果,他强调电动汽车充电应该被视为国家 基础设施,与沙特的主要能源系统同步发展。 (原标题:沙特电动汽车充电器工厂奠基) ...
X @Yuyue
Yuyue· 2025-12-09 11:51
核心逻辑其实很简单,就是股市炒机器人题材的时候、股市炒 AI 板块的时候、股市炒能源的时候,币圈也要有能炒的标的能早期参与的路子目前看来似乎就是在 Fuse Energy 应用程序中连接家里现有的电动汽车充电器、太阳能电池板和电池,将能源使用转移到用电低谷时段。所以 @fuseenergy 解决了什么问题呢,解决了暂时币圈没有能源项目可以炒作的问题。别的什么数据就有点不那么重要了。比如据说已经为超过 20 万户家庭提供服务,创造了 3 亿美元的年度经常性收入……之类的。机构背景还可以,能上好点的交易所的话就有得玩,下课Fuse Energy (@fuseenergy):$ENERGY is the incentive layer of The Energy Network. Here’s how it works 👇1/ Register: Connect your home or existing EV chargers, solar panels, and batteries in the Fuse Energy app. No proprietary hardware required.2/ Shift ...
首家省级开源鸿蒙制造业创新中心落户前海;SK集团将出售电动汽车充电器制造部门SK Signet丨智能制造日报
创业邦· 2025-05-16 03:12
Group 1 - The first cross-border e-commerce TIR international truck from Henan has successfully launched, marking the integration of cross-border e-commerce and TIR transportation mode, enhancing logistics efficiency for inland regions and supporting "Made in China" exports [1] - The first provincial-level open-source Harmony manufacturing innovation center has been established in Qianhai, focusing on core technologies like real-time computing and AI, aiming to develop a unified operating system for distributed heterogeneous multi-machine collaborative robots [1] - SK Group plans to sell 62.9% of its electric vehicle charger manufacturing subsidiary, SK Signet, as part of its business rebalancing efforts, facing significant operational losses [1] - Foxconn has received approval from the Indian government for a $433 million semiconductor joint venture with HCL Group, expected to produce display driver chips with a monthly capacity of 20,000 wafers and 36 million chips [1] - TSMC is set to accelerate its factory construction, planning to build 9 new facilities globally this year, including 8 wafer fabs and 1 advanced packaging plant, with significant advancements in 2nm technology expected [1]