虚拟电厂资源聚合平台
Search documents
国网北京亦庄供电公司 传承主动服务基因 编译“三超”发展密码
Bei Jing Ri Bao Ke Hu Duan· 2025-09-30 22:13
Core Viewpoint - The article highlights the significant role of State Grid Beijing Yizhuang Power Supply Company in supporting the economic development of Beijing Economic-Technological Development Area (BDA) through proactive service and innovative power solutions, achieving remarkable growth in power demand and infrastructure development [1][10]. Group 1: Company Development and Achievements - Established in 1993, Yizhuang Power Supply Company has been dedicated to serving the capital's electricity needs and the development of BDA, embedding "proactive service" in its core values [1]. - In 2024, BDA is expected to lead Beijing in maximum load growth and electricity consumption growth, supporting the region's GDP growth, industrial output, and investment [1]. - The company has achieved a record of completing project approvals and construction for a 500 kV substation in just over 400 days, setting a new benchmark for similar projects [9][11]. Group 2: Innovative Power Solutions - Yizhuang Power Supply Company has adopted a non-traditional approach to substation construction, building facilities to their maximum capacity from the outset to meet the rapidly increasing electricity demands of local enterprises [10]. - The company has successfully integrated multiple substations within a limited area to support high-demand projects, such as those in the integrated circuit sector [9][10]. Group 3: Service Excellence - The company has positioned itself as an "electricity consultant," actively engaging in the site selection process for major projects, such as Sanofi's pharmaceutical center, by providing detailed electricity cost analyses [12]. - Yizhuang Power Supply Company has streamlined the electricity connection process for projects, significantly reducing the time required for project approvals and electricity access [13]. Group 4: Green Transformation Initiatives - The establishment of the "Green Electricity and Green Certificate Service Station" has led to a significant increase in green electricity purchases, with BDA users buying 12.38 billion kWh of green electricity in 2024, accounting for 20% of Beijing's total [16]. - The company is actively involved in carbon monitoring and efficiency services, helping local enterprises develop personalized green electricity reduction plans [17]. - Yizhuang Power Supply Company is exploring new energy development paths, including virtual power plants and innovative energy storage technologies [19].
上海重磅补贴新型储能和虚拟电厂,2025年9月1日前并网项目享最高标准
中关村储能产业技术联盟· 2025-05-20 09:40
Core Viewpoint - The article discusses the implementation of the "Shanghai New Power System Regulation Capability Reward Fund Management Measures," which aims to provide financial subsidies for projects that enhance the regulation capabilities of the new power system in Shanghai, including virtual power plants, V2G (Vehicle-to-Grid) capabilities, and new energy storage systems [1][9][48]. Summary by Sections Reward Standards for Projects Connected Before September 1, 2025 - Virtual power plant resource aggregation platforms will receive a reward of 50 yuan per kilowatt per year, with a maximum annual reward of 1.5 million yuan, applicable for three consecutive years [2][52]. - V2G regulation capabilities have specific reward standards based on performance assessments, with rewards available for three years [2][53]. - New energy storage systems will receive rewards based on actual discharge amounts, with user-side storage receiving 0.2 yuan per kilowatt-hour and independent storage stations receiving 0.35 yuan per kilowatt-hour, with a maximum annual reward of 600 kilowatt-hours per kilowatt-hour of storage capacity [3][55]. Reward Standards for Subsequent Projects (2026-2028) - Reward standards for projects connected from 2026 to 2028 will decrease annually: virtual power plants and V2G projects will decrease by 5% each year, while new energy storage projects will decrease by 10% [5][57]. Eligibility Criteria for Reward Applicants - Companies must have a good credit status, with no serious breaches of trust in the energy or environmental sectors within the last three years, and must not be listed as untrustworthy or involved in major tax violations [6][59]. Technical Requirements for New Energy Storage Projects - New energy storage projects must utilize advanced technologies with at least 15% of the total capacity using such technologies to qualify for the 2025 reward standards, increasing by 10% each subsequent year [7][60]. Responsibilities and Management - The Shanghai Development and Reform Commission is responsible for overseeing the development of new power system regulation capabilities, including the review of reward fund applications and the allocation of funds [28][30].